83 Page Ave

83 Page Ave is in Bayview Village. It's outside TRCA flood hazard areas and there are 9 planning applications nearby (six under review, three approved by the tribunal).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • 2 open building orders from the City.
  • Outside TRCA flood hazard areas.
  • 9 planning applications within 250 m: six under review, three approved by the tribunal.
Building permits0in the last 5 years
Applications nearby9active, within 250 m
Flood hazardOutsideTRCA mapping
Next collectionNov 13garbage, green bin and yard waste
Finch AveWoodthrush CrtPage AveTollerton AveKnollview CresBrucedale CresHeathview AveFinchgate Crt123456789Map data: City of Toronto (Toronto Centreline)Finch AveWoodthrush CrtPage AveMango DrKnollview CresBrucedale CresFinchgate Crt123456789Map data: City of Toronto (Toronto Centreline)
The red dot is 83 Page Ave. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

03The building

ItemFindingPrecisionSource
Building orders and notices2 openThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years0 permitsThis addressBuilding Permits · 1 on record

0 building permits in the last 5 years. Together they added 1 new home. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 1 project from 1 permit
  • Demolition and addition · examiner's notice sent · issued Jul 30, 2026
    Construction of a rear sunroom addition and balcony, new secondary suite in basement and demolition of interior stairs. Sunroom addition is unconditioned space. No changes to existing ventilation… · Permit 26 211332

04Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaInside: TRCA permit may be needed for workThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. It is inside TRCA's regulated area, so additions, grading or other work may need a TRCA permit. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M2K0% of tests above Ontario's limitYour area · M2KNon Regulated Lead Sample · 31 tests, May 23, 2014 to Sep 11, 2025

In postal area M2K, 0 of 31 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M2K is lower than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 1 samples here (3.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

01What’s changing nearby

9 active planning applications within 250 m (about a 3-minute walk): six under review, three approved by the tribunal. That's more than at most Toronto addresses (the typical address has 1).

  1. 1
    630 Finch Ave E · 147 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application to permit a 12-storey mixed use building with 206 residential units, 897 sqaure metres of non-residential space, and 311 vehicular parking spaces.
    File 21 165270 NNY 17 SA · submitted Jun 3, 2021 · City record
  2. 2
    630 Finch Ave E · 147 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Zoning Bylaw Amendment application to permit the proposal for a 12 storey mixed use building that would contain 206 dwelling units, 897 sqm of non residential gross floor area and 311 proposed parking spaces within a proposed three level…
    File 20 188104 NNY 17 OZ · submitted Sep 1, 2020 · City record
  3. 3
    630 Finch Ave E · 147 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for 206 units.
    File 21 236504 NNY 17 CD · submitted Nov 10, 2021 · City record
  4. 4
    73 X Banstock Dr · 156 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application to permit a 12-storey mixed use building with 206 residential units, 897 sqaure metres of non-residential space, and 311 vehicular parking spaces.
    File 21 165270 NNY 17 SA · submitted Jun 3, 2021 · City record
  5. 5
    73 X Banstock Dr · 156 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for 206 units.
    File 21 236504 NNY 17 CD · submitted Nov 10, 2021 · City record
  6. 6
    73 X Banstock Dr · 156 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Zoning Bylaw Amendment application to permit the proposal for a 12 storey mixed use building that would contain 206 dwelling units, 897 sqm of non residential gross floor area and 311 proposed parking spaces within a proposed three level…
    File 20 188104 NNY 17 OZ · submitted Sep 1, 2020 · City record
  7. 7
    648 Finch Ave E · 232 m away
    Condominium: a request to divide a building into condominium units

    City planners are reviewing it. Residents can comment before a decision is made.

    *** Draft Plan of Condominium for 206 units.
    File 21 236504 NNY 17 CD · submitted Nov 10, 2021 · City record
  8. 8
    648 Finch Ave E · 232 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    Site Plan application to permit a 12-storey mixed use building with 206 residential units, 897 sqaure metres of non-residential space, and 311 vehicular parking spaces.
    File 21 165270 NNY 17 SA · submitted Jun 3, 2021 · City record
  9. 9
    648 Finch Ave E · 232 m away
    Official Plan / Rezoning: a request to change the Official Plan or zoning so something new can be built

    The Ontario Land Tribunal (formerly the OMB) approved it.

    Zoning Bylaw Amendment application to permit the proposal for a 12 storey mixed use building that would contain 206 dwelling units, 897 sqm of non residential gross floor area and 311 proposed parking spaces within a proposed three level…
    File 20 188104 NNY 17 OZ · submitted Sep 1, 2020 · City record
Short-term rentals nearby0 registered homesWithin 250 mShort Term Rentals Registration

No homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). Most Toronto addresses (73%) have at least one short-term rental nearby.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

02City services

ItemFindingPrecisionSource
Garbage and recyclingFridaysThis addressSolid Waste Collection Schedule

Next: November 13: garbage, green bin and yard waste. November 20: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorShelley CarrollWard 17councillor_carroll@toronto.ca · 416-338-2650

05Quick answers about 83 Page Ave

Is 83 Page Ave in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 83 Page Ave?

There are 9 active planning applications within 250 metres (six under review, three approved by the tribunal). The closest is at 630 Finch Ave E, 147 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 83 Page Ave been renovated?

Yes. The City has 1 building permit on record, 0 in the last 5 years. Source: Building Permits.

Is 83 Page Ave a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 83 Page Ave?

Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 13, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

83 Page Ave, Toronto M2K: permits, flood risk and what's planned nearby · My Address in Toronto