85 Upper Canada Dr

An address in St.Andrew-Windfields, outside TRCA flood and shoreline hazard areas, with 4 active development applications within 250 metres.

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
  • 4 active development applications and 1 Committee of Adjustment application within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications5active within 250 m
Flood hazardOutsideTRCA mapping
Normandale CresAldershot CresYorkminster RdHarrison Garden BlvdUpper Canada DrLord Seaton RdYonge StHighway 401 C EHighway 401 X EHighway 401 C WHighway 401 X W12345Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years6 permitsThis addressBuilding Permits · 6 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (6)
  • New Building · Closed · Dec 8, 2025
    REV01: Proposed revision for extending the recessed second-floor wall to flush with the main façade.Proposal to demolish existing dwelling and construct a two storey dwelling with rear deck, rear… · Permit 24 142100 BLD
  • Building Permit Related(MS) · Closed · Nov 14, 2024
    HVAC - Proposal to demolish existing dwelling and construct a two storey dwelling with rear deck, rear basement walk-out and integral garage.See also 23-190712 ZAP & 23-229838 NNY 15 MV · Permit 24 142100 HVA
  • Demolition · Closed · May 23, 2024
    Proposal to demolish existing one-storey dwelling and construct a two-storey single family dwelling with intregral garage.See also 23-190712 ZAP & 24-142100 BLD 00 NH · Permit 24 142137 DEM
  • Building Permit Related(PS) · Closed · May 16, 2024
    Plumbing - Proposal to demolish existing dwelling and construct a two storey dwelling with rear deck, rear basement walk-out and integral garage.See also 23-190712 ZAP & 23-229838 NNY 15 MV · Permit 24 142100 PLB
  • New Building · Closed · May 16, 2024
    Proposal to demolish existing dwelling and construct a two storey dwelling with rear deck, rear basement walk-out and integral garage.See also 23-190712 ZAP & 23-229838 NNY 15 MV · Permit 24 142100 BLD
  • Building Permit Related (DR) · Closed · May 16, 2024
    Drain - Proposal to demolish existing dwelling and construct a two storey dwelling with rear deck, rear basement walk-out and integral garage.See also 23-190712 ZAP & 23-229838 NNY 15 MV · Permit 24 142100 DRN

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA43Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M2P0 of 11 above 0.01 ppmYour area · M2PNon Regulated Lead Sample · May 21, 2014 to Jun 9, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    8 Oakburn Cres · 217 m · Site Plan · Under Review
    Proposal for two 18-storey purpose built rental apartment buildings with a total gross floor area of 35,830.7square metres for 452 rental residential units, resulting in a density of 4.51 FSI. (21-185510 NNY 18OZ)
    File 22 139736 NNY 18 SA · submitted Apr 28, 2022 · City record
  2. 2
    6 Oakburn Cres · 222 m · Site Plan · Under Review
    Proposal for two 18-storey purpose built rental apartment buildings with a total gross floor area of 35,830.7square metres for 452 rental residential units, resulting in a density of 4.51 FSI. (21-185510 NNY 18OZ)
    File 22 139736 NNY 18 SA · submitted Apr 28, 2022 · City record
  3. 3
    10-12 Oakburn Cres · 227 m · Site Plan · Under Review
    Proposal for two 18-storey purpose built rental apartment buildings with a total gross floor area of 35,830.7square metres for 452 rental residential units, resulting in a density of 4.51 FSI. (21-185510 NNY 18OZ)
    File 22 139736 NNY 18 SA · submitted Apr 28, 2022 · City record
  4. 4
    2-4 Oakburn Cres · 244 m · Site Plan · Under Review
    Proposal for two 18-storey purpose built rental apartment buildings with a total gross floor area of 35,830.7square metres for 452 rental residential units, resulting in a density of 4.51 FSI. (21-185510 NNY 18OZ)
    File 22 139736 NNY 18 SA · submitted Apr 28, 2022 · City record
  5. 5
    54 Yorkminster Rd · 115 m · Committee of Adjustment · Minor variance · Hearing Scheduled
    To construct a new dwelling with integral garage.
    File A0089/21NY · submitted Feb 10, 2021

Development Applications; Committee of Adjustment Applications · 3 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 13, 2026This addressCollection calendar Friday 2
Next recyclingNovember 20, 2026This addressSolid Waste Collection Schedule
City councillorRachel Chernos Lin Ward 15Councillor_ChernosLin@toronto.ca · 416-395-6408

05Quick answers about 85 Upper Canada Dr

Is 85 Upper Canada Dr in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 85 Upper Canada Dr?

4 active development applications within 250 metres, the closest at 8 Oakburn Cres (217 m). Source: Development Applications.

When is garbage day at 85 Upper Canada Dr?

Collection calendar Friday 2. Next garbage pickup: Nov 13, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

85 Upper Canada Dr, Toronto — address report · My Address in Toronto