Skip to content
My Address in Toronto
Address report

878 Lawrence Ave E

878 Lawrence Ave E is in Banbury-Don Mills, in a registered apartment building built in 1960 with 11 units. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (two under review, one under appeal after a refusal).

Data as of Nov 8, 2026 · Every item lists its source

Follow this address
Key findings
  • This building scored 88 out of 100 when last evaluated (Jul 15, 2026). That's lower than 75% of evaluated buildings in Toronto.
  • Outside TRCA flood hazard areas.
  • 3 planning applications within 250 m: two under review, one under appeal after a refusal.
RentSafe score88out of 100
Fire code violations—no inspection records
Applications nearby3active, within 250 m
Flood hazardOutsideTRCA mapping
Lawrence AveThe DonwayTernhill CresNorden CresTremont CresGladwyn RdCassidy PlLangbourne PlJocelyn Cres123Map data: City of Toronto (Toronto Centreline)Lawrence AveThe DonwayLangbourne PlTremont CresGladwyn RdJocelyn CresSanderling Pl123Map data: City of Toronto (Toronto Centreline)
The red dot is 878 Lawrence Ave E. The circle shows 250 metres, about a 3-minute walk. Numbers match the applications in “What’s changing nearby”.

01The building

ItemFindingPrecisionSource
RentSafe evaluation88 / 100This addressApartment Building Evaluation · evaluated Jul 15, 2026

RentSafe is the City's inspection program for apartment buildings with 3+ storeys and 10+ units. This building scored 88 out of 100 when last evaluated (Jul 15, 2026). That's lower than 75% of evaluated buildings in Toronto.

Building3 storeys · 11 units · built 1960This addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years1 permitThis addressBuilding Permits · 1 on record

1 building permit in the last 5 years. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.

Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register

It isn't listed or designated on the City's Heritage Register.

Permit history: 1 project from 1 permit
  • Interior Alterations · inspection · issued Jun 3, 2025
    Proposed interior alterations to create a new bachelor apartment suite on the first floor · Permit 24 131944

02Risks and environment

ItemFindingPrecisionSource
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025

TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.

Lead in tap-water tests, postal area M3C0% of tests above Ontario's limitYour area · M3CNon Regulated Lead Sample · 26 tests, Jun 2, 2014 to Jun 12, 2026

In postal area M3C, 0 of 26 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. Buildings with more than six units don't have lead service pipes.

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

3 active planning applications within 250 m (about a 3-minute walk): two under review, one under appeal after a refusal. That's about typical for Toronto (the typical address has 1).

  1. 1
    230 The Donway W · 152 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    The Site Plan application proposes the development of a six (6)-storey apartment building with a place of worship on the ground floor. The existing place of worship buildings will be demolished. An Options for Homes development.
    File 24 252584 NNY 16 SA · submitted Dec 20, 2024 · City record
  2. 2
    10 Langbourne Pl · 175 m away
    Committee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks

    The Committee of Adjustment refused it on Oct 1, 2015. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.

    To construct a new two-storey detached dwelling with an integral garage. The existing dwelling would be demolished.
    File A0768/15NY · submitted Aug 17, 2015
  3. 3
    240 The Donway W · 201 m away
    Site Plan: City review of the design and layout of a new building

    City planners are reviewing it. Residents can comment before a decision is made.

    The Site Plan application proposes the development of a six (6)-storey apartment building with a place of worship on the ground floor. The existing place of worship buildings will be demolished. An Options for Homes development.
    File 24 252584 NNY 16 SA · submitted Dec 20, 2024 · City record
Short-term rentals nearby0 registered homesWithin 250 mShort Term Rentals Registration

No homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). Most Toronto addresses (73%) have at least one short-term rental nearby.

Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.

04City services

ItemFindingPrecisionSource
Garbage and recyclingWednesdaysThis addressSolid Waste Collection Schedule

Next: November 11: garbage, green bin and yard waste. November 18: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.

City councillorJon BurnsideWard 16Councillor_Burnside@toronto.ca · 416-397-9256

05Quick answers about 878 Lawrence Ave E

Is 878 Lawrence Ave E in a flood plain?

No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.

What is being built near 878 Lawrence Ave E?

There are 3 active planning applications within 250 metres (two under review, one under appeal after a refusal). The closest is at 230 The Donway W, 152 m away. Source: Development Applications; Committee of Adjustment Applications.

Has 878 Lawrence Ave E been renovated?

Yes. The City has 1 building permit on record, 1 in the last 5 years. Source: Building Permits.

Is 878 Lawrence Ave E a heritage property?

No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.

When is garbage day at 878 Lawrence Ave E?

Collection is on Wednesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 11, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

No archive photos have been located within 250 metres yet.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location

878 Lawrence Ave E, Toronto M3C: permits, flood risk and what's planned nearby · My Address in Toronto