88 Beaver Ave
88 Beaver Ave is in Junction-Wallace Emerson. It's outside TRCA flood hazard areas and there is 1 planning application nearby (approved).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 1 planning application within 250 m: approved.
03The building
0 building permits in the last 5 years. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 1 project from 2 permits
- Interior Alterations · completed Feb 25, 2022
Proposal for interior alterations to existing single family dwelling and new furnace · 2 permits in this project (such as building, plumbing and heating) · Permit 21 100551
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M6H, 13 of 538 home tap-water samples (2.4%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M6H is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 25 samples here (4.6%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
1 active planning application within 250 m (about a 3-minute walk): approved. That's about typical for Toronto (the typical address has 1).
- 138 Brandon Ave · 219 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment approved it on Oct 25, 2023.
To construct a new one-storey ancillary building (semi-detached garage) in the rear yard of the existing two-storey semi-detached dwelling. The existing semi-detached garage will be demolished.File A0787/23TEY · submitted Sep 12, 2023
3 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's about typical for Toronto (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: recycling and green bin. November 20: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 88 Beaver Ave
Is 88 Beaver Ave in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 88 Beaver Ave?
There is 1 active planning application within 250 metres (approved). The closest is at 38 Brandon Ave, 219 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 88 Beaver Ave been renovated?
Yes. The City has 2 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 88 Beaver Ave a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 88 Beaver Ave?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 20, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location