88 Bowmore Rd
88 Bowmore Rd is in Woodbine Corridor. It's outside TRCA flood hazard areas and there are no active planning applications nearby.
Data as of Nov 8, 2026 · Every item lists its source
- 4 building permits in the last 5 years.
- Outside TRCA flood hazard areas.
03The building
4 building permits in the last 5 years, for 3 projects. For comparison, about 1 in 10 Toronto addresses had any permit in that time. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 8 projects from 11 permits
- Sign Building Permit Related · completed Jun 11, 2025
Application for a permit to erect and display one illuminated, double-sided ground sign, already approved by sign Variance # 23-141341.*****BOWMORE PUBLIC SCHOOL***** · Permit 23 191821 - Fire Damage · completed Nov 24, 2025
Small fire incident occurred in an existing classroom, some of the interior finishes were damaged. The scope of this project is to restore interior finishes, install new door, windows, light… · 2 permits in this project (such as building, plumbing and heating) · Permit 23 191366 - Interior Alterations · completed May 6, 2022
Proposal for new handrails in stairwell 11. · Permit 21 246756 - Interior Alterations · completed Feb 18, 2021
Proposed: door replacement and installation of power-Door operators. · Permit 19 197290 - Building work · completed Nov 24, 2025
Proposal for minor alterations to existing classroom B001 and adjacent vestibule. Construction of 1 barrier free kindergarten washroom stall within classroom B001 and a relocated entrance to… · 3 permits in this project (such as building, plumbing and heating) · Permit 18 225116 - Solar Collector · permit issued · issued Sep 1, 2017
Proposal to install a rooftop photovoltaic array on existing school - Bowmore Rd Junior and Senior Public School · Permit 17 210849 - Interior Alterations · completed Feb 25, 2026
interior alterations to classroom 113 · Permit 15 151078 - Backflow Prevention Devices (Water only) · completed Mar 2, 2018
Proposed installation of one premise isolation back flow preventer for Bowmore Road Junior & Senior Public School. · Permit 14 136219
04Risks and environment
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M4L, 10 of 667 home tap-water samples (1.5%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M4L is about the same as the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 40 samples here (6.0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
No active planning applications within 250 m (about a 3-minute walk). Most Toronto addresses (64%) have at least one application nearby.
7 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 10: recycling and green bin. November 17: garbage, green bin and yard waste. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 88 Bowmore Rd
Is 88 Bowmore Rd in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 88 Bowmore Rd?
There are no active development or Committee of Adjustment applications within 250 metres. Source: Development Applications; Committee of Adjustment Applications.
Has 88 Bowmore Rd been renovated?
Yes. The City has 11 building permits on record, 4 in the last 5 years. Source: Building Permits.
Is 88 Bowmore Rd a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 88 Bowmore Rd?
Collection is on Tuesdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 17, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives


Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location