9 Pember Dr
An address in Maple Leaf, outside TRCA flood and shoreline hazard areas, with no active development applications within 250 metres.
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood and shoreline hazard areas.
01The building
Recent permits (5)
- Multiple Projects · Closed · Sep 20, 2013
Revision 02 - change layout on basement (furnace and wc) and main floor (relocation of door and windows, structure for second floor)(Revision 01 - structural changes in basement and on first… · Permit 12 152914 BLD - Building Permit Related(MS) · Closed · Jan 4, 2013
HVAC - Proposed construction of two storey side and rear addition, one storey side addition, second floor addition interior alteration, front porch, rear concrete deck with cold room below and… · Permit 12 152914 HVA - Multiple Projects · Closed · Aug 28, 2012
Revision 01 - structural changes in basement and on first floorProposed construction of two storey side and rear addition, one storey side addition, second floor addition interior alteration, front… · Permit 12 152914 BLD - Building Permit Related(PS) · Closed · Apr 24, 2012
Plumbing - Proposed construction of two storey side and rear addition, one storey side addition, second floor addition interior alteration, front porch, rear concrete deck with cold room below and… · Permit 12 152914 PLB - Multiple Projects · Closed · Apr 24, 2012
Proposed construction of two storey side and rear addition, one storey side addition, second floor addition interior alteration, front porch, rear concrete deck with cold room below and basement… · Permit 12 152914 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
No active development or Committee of Adjustment applications within 250 metres.
Development Applications; Committee of Adjustment Applications · 3 registered short-term rentals within 250 m.
04City services
05Quick answers about 9 Pember Dr
Is 9 Pember Dr in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 9 Pember Dr?
0 active development applications within 250 metres. Source: Development Applications.
When is garbage day at 9 Pember Dr?
Collection calendar Friday 2. Next garbage pickup: Nov 13, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location