90 Upper Canada Dr
90 Upper Canada Dr is in St.Andrew-Windfields. It's outside TRCA flood hazard areas and there are 5 planning applications nearby (four under review, one waiting for a hearing date).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 5 planning applications within 250 m: four under review, one waiting for a hearing date.
03The building
0 building permits in the last 5 years. Together they added 1 new home. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 2 projects from 6 permits
- New Building · completed Mar 4, 2022
Revision for circular driveway.Proposal to construct a new 2 storey SFD-detached dwelling. See also 17 169950 DEM, and 16 268081 ZZC. · 5 permits in this project (such as building, plumbing and heating) · Permit 17 169972 - Demolition · completed Aug 14, 2017
Proposal to demolish the existing 2 storey SFD-detached dwelling. · Permit 17 169950
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M2P, 0 of 17 home tap-water samples (0%) tested above Ontario's limit for lead (10 micrograms per litre). That's too few samples to compare with the rest of the city. Health Canada recommends a stricter limit of 5 micrograms per litre: 0 samples here (0%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
5 active planning applications within 250 m (about a 3-minute walk): four under review, one waiting for a hearing date. That's more than at most Toronto addresses (the typical address has 1).
- 154 Yorkminster Rd · 129 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The City has received it. A hearing date hasn't been set yet.
To construct a new dwelling with integral garage.File A0089/21NY · submitted Feb 10, 2021 - 28 Oakburn Cres · 159 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposal for two 18-storey purpose built rental apartment buildings with a total gross floor area of 35,830.7square metres for 452 rental residential units, resulting in a density of 4.51 FSI. (21-185510 NNY 18OZ)File 22 139736 NNY 18 SA · submitted Apr 28, 2022 · City record - 310-12 Oakburn Cres · 161 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposal for two 18-storey purpose built rental apartment buildings with a total gross floor area of 35,830.7square metres for 452 rental residential units, resulting in a density of 4.51 FSI. (21-185510 NNY 18OZ)File 22 139736 NNY 18 SA · submitted Apr 28, 2022 · City record - 46 Oakburn Cres · 169 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposal for two 18-storey purpose built rental apartment buildings with a total gross floor area of 35,830.7square metres for 452 rental residential units, resulting in a density of 4.51 FSI. (21-185510 NNY 18OZ)File 22 139736 NNY 18 SA · submitted Apr 28, 2022 · City record - 52-4 Oakburn Cres · 201 m awaySite Plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Proposal for two 18-storey purpose built rental apartment buildings with a total gross floor area of 35,830.7square metres for 452 rental residential units, resulting in a density of 4.51 FSI. (21-185510 NNY 18OZ)File 22 139736 NNY 18 SA · submitted Apr 28, 2022 · City record
10 homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). That's more than at most Toronto addresses (the typical address has 2).
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 13: garbage, green bin and yard waste. November 20: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 90 Upper Canada Dr
Is 90 Upper Canada Dr in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 90 Upper Canada Dr?
There are 5 active planning applications within 250 metres (four under review, one waiting for a hearing date). The closest is at 54 Yorkminster Rd, 129 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 90 Upper Canada Dr been renovated?
Yes. The City has 6 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 90 Upper Canada Dr a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 90 Upper Canada Dr?
Collection is on Fridays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 13, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location