93 Grey Rd
93 Grey Rd is in Bedford Park-Nortown. It's outside TRCA flood hazard areas and there are 3 planning applications nearby (one approved, one refused, one under appeal after a refusal).
Data as of Nov 8, 2026 · Every item lists its source
- Outside TRCA flood hazard areas.
- 3 planning applications within 250 m: one approved, one refused, one under appeal after a refusal.
- Lead in tap-water samples is higher than average in postal area M5M.
03The building
0 building permits in the last 5 years. Together they added 2 new homes. Permits show work the City approved; they don't show work done without a permit.
It isn't listed or designated on the City's Heritage Register.
Permit history: 4 projects from 10 permits
- Deck · completed Mar 22, 2023
Construct rear deck · Permit 21 210766 - New Building · completed May 20, 2020
Proposed - Part a - New 2-Storey detached house with integral garage and basement · 4 permits in this project (such as building, plumbing and heating) · Permit 18 217476 - New Building · completed May 20, 2020
Proposed - Part b - New 2-Storey detached house with integral garage and basement · 4 permits in this project (such as building, plumbing and heating) · Permit 18 217491 - Demolition · completed Jan 8, 2019
Proposed - Demolish existing single family dwelling to create part a & b - New 2-Storey detached house with integral garage and basement · Permit 18 217490
04Risks and the ground
TRCA's maps show this address is outside the areas that could flood from rivers in a major storm (TRCA plans for a storm like Hurricane Hazel in 1954) and outside lake shoreline hazards. Basement flooding from overloaded sewers can still happen anywhere in the city.
In postal area M5M, 15 of 422 home tap-water samples (3.6%) tested above Ontario's limit for lead (10 micrograms per litre). Across Toronto, 2.0% of samples did, so M5M is higher than the city overall. Health Canada recommends a stricter limit of 5 micrograms per litre: 39 samples here (9.2%) were above it. These are voluntary tests, mostly from older homes, so they don't tell you about this house. Lead comes from old pipes and plumbing, not the City's treatment plants. If your home was built before the mid-1950s, you can get a free test kit by calling 311.
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
01What’s changing nearby
3 active planning applications within 250 m (about a 3-minute walk): one approved, one refused, one under appeal after a refusal. That's about typical for Toronto (the typical address has 1).
- 193 Grey Rd · 0 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Jan 12, 2017.
To construct a new detached two-storey dwelling with an integral garage. The existing dwelling would be demolished. File Numbers B0062/16NY, A0869/16NY(PART 1), A0873/16NY(PART 2) will be considered jointly.File A0873/16NY · submitted Oct 6, 2016 - 2385 Melrose Ave · 146 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
The Committee of Adjustment refused it on Jan 26, 2017. It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
To construct a new three-storey dwelling. The existing dwelling would be demolished.File A0989/16NY · submitted Nov 14, 2016 - 31914 Avenue Rd · 211 m awayCondominium: a request to divide a building into condominium units
It has been approved.
Draft Plan of Condominium to create 5 non-residential condo units.File 25 250843 NNY 08 CD · submitted Nov 7, 2025 · City record
No homes within 250 m are registered with the City as short-term rentals (stays of less than 28 days, like Airbnb). Most Toronto addresses (73%) have at least one short-term rental nearby.
Development Applications; Committee of Adjustment Applications; Short Term Rentals Registration.
02City services
Next: November 12: garbage, green bin and yard waste. November 19: recycling and green bin. Green bin goes out every week; garbage and recycling alternate.
05Quick answers about 93 Grey Rd
Is 93 Grey Rd in a flood plain?
No. TRCA maps it outside river flood and lake shoreline hazard areas. Basement flooding from sewers can still happen anywhere. Source: TRCA Regulation mapping 2025.
What is being built near 93 Grey Rd?
There are 3 active planning applications within 250 metres (one approved, one refused, one under appeal after a refusal). The closest is at 93 Grey Rd, 0 m away. Source: Development Applications; Committee of Adjustment Applications.
Has 93 Grey Rd been renovated?
Yes. The City has 10 building permits on record, 0 in the last 5 years. Source: Building Permits.
Is 93 Grey Rd a heritage property?
No. It isn't listed or designated on the City's Heritage Register. Source: Heritage Register.
When is garbage day at 93 Grey Rd?
Collection is on Thursdays. Green bin goes out every week; garbage and recycling alternate weeks. The next garbage pickup is Nov 12, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives
No archive photos have been located within 250 metres yet.
Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location