An address in Etobicoke City Centre, outside TRCA flood and shoreline hazard areas, with 6 active development applications within 250 metres.

Data as of Nov 7, 2026 · Every item lists its source

Follow this address
Key findings
  • Outside TRCA flood and shoreline hazard areas.
  • 6 active development applications and 1 Committee of Adjustment application within 250 m.
RentSafe score—not a registered apartment building
Fire code violations—no inspection records
Applications7active within 250 m
Flood hazardOutsideTRCA mapping
Munster AveBering AveShawbridge AveSt Albans RdAcorn AveFieldway RdJudge RdAukland RdJopling Ave SKipling AveDundas St W1234567Map data: City of Toronto (Toronto Centreline)
The red circle shows the 250-metre radius used for “Nearby” items. Numbers match the applications listed below.

01The building

ItemFindingPrecisionSource · as of
RentSafe evaluationNot a registered apartment buildingThis addressApartment Building Evaluation
Fire code inspectionsNo inspection recordsThis addressResidential Fire Inspection Results
Building orders and noticesNone on recordThis addressBuilding Construction/Demolition Violations
Building permits, last 5 years3 permitsThis addressBuilding Permits · 26 on record
Short-term rentalNot registeredThis addressShort Term Rentals Registration
Heritage statusNot on the Heritage RegisterThis addressHeritage Register
Recent permits (8)
  • Other(BA) · Inspection · Dec 7, 2022
    Structural rehabilitation of station including degraded concrete demolition & replacement, crack injection, galvanic anode installation · Permit 22 184836 BLD
  • Building Permit Related(PS) · Closed · Jul 5, 2022
    Revision 01 - new layout of the fire protection BFP, remove water piping to valve room, update piping and water meter, see attached cover letterPlumbing - Replacement of water meter and installation… · Permit 20 218774 PLB
  • Building Permit Related(PS) · Closed · Mar 11, 2022
    Plumbing - Replacement of water meter and installation of four (4) backflow preventers. Connections to supervisory valves to fire alarm panel. · Permit 20 218774 PLB
  • Other(BA) · Closed · Dec 1, 2020
    Replacement of water meter and installation of three (3) backflow preventers. Connections to supervisory valves to fire alarm panel. · Permit 20 218774 BLD
  • Inside and Outside Drains · Cancelled · Nov 16, 2020
    Drain - Replacement of water meter and installation of three (3) backflow preventers. Connections to supervisory valves to fire alarm panel. · Permit 20 218774 STS
  • Building Permit Related(MS) · Closed · Jan 8, 2019
    Rev 1 - Proposed revision HVAC layoutHVAC - Proposal for interior alterations including structural, plumbing and drainage, fire protection upgrades mechanical and electrical work to provide new… · Permit 16 189702 HVA
  • Interior Alterations · Closed · Aug 21, 2017
    Proposal for interior alterations for the removal of Legacy Fare Gates and the installation of Presto Fare Gates - KIPLING STATION · Permit 17 205284 BLD
  • Re-Roofing/Re-Cladding · Closed · Apr 24, 2017
    Re-roofing and installation of new guard rails and windows replacement at south side of the station. · Permit 17 146695 BLD

02Risks and the ground

ItemFindingPrecisionSource · as of
River flood hazardOutsideThis addressTRCA Regulation mapping 2025
Lake shoreline hazardOutsideThis addressTRCA Regulation mapping 2025
TRCA regulated areaOutsideThis addressTRCA Regulation mapping 2025
Basement flooding study areaBFA49Your areaBasement Flooding Study Areas · the City divides all of Toronto into study areas; this names yours, not a risk level
Lead in tap water samples, postal area M8Z0 of 63 above 0.01 ppmYour area · M8ZNon Regulated Lead Sample · Jan 21, 2014 to Mar 23, 2026

TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.

03What’s changing nearby

  1. 1
    970 Kipling Ave · 125 m · Site Plan · NOAC Issued
    Proposed 43-storey tower and a 28-storey tower. The Subject Site will include 839 purpose-built rental apartments comprised of 198 affordable units and 641 market units as well as approximately 13,560 SF of retail space.
    File 26 175993 WET 03 SA · submitted Jun 2, 2026 · City record
  2. 2
    10 Beamish Dr · 227 m · Site Plan · NOAC Issued
    Proposal to develop a 44-storey mixed use building with 530 dwelling units and 240 square metres of non-residential GFA at grade.
    File 25 212846 WET 03 SA · submitted Aug 19, 2025 · City record
  3. 3
    8 Beamish Dr · 235 m · Site Plan · NOAC Issued
    Proposal to develop a 44-storey mixed use building with 530 dwelling units and 240 square metres of non-residential GFA at grade.
    File 25 212846 WET 03 SA · submitted Aug 19, 2025 · City record
  4. 4
    60 Fieldway Rd · 244 m · Site Plan · Under Review
    Site Plan application proposing to redevelop the site into a mixed-use community comprised of four tall buildings at 12, 23, 34 and 42 storeys. The proposal introduces a total of 1,340 new residential units and 1,536 square metres of…
    File 23 127950 WET 03 SA · submitted Mar 28, 2023 · City record
  5. 5
    60 Fieldway Rd · 244 m · Subdivision · Under Review
    File 21 223579 WET 03 SB · submitted Oct 8, 2021 · City record
  6. 6
    6 Beamish Dr · 245 m · Site Plan · NOAC Issued
    Proposal to develop a 44-storey mixed use building with 530 dwelling units and 240 square metres of non-residential GFA at grade.
    File 25 212846 WET 03 SA · submitted Aug 19, 2025 · City record
  7. 7
    899 Kipling Ave · 197 m · Committee of Adjustment · Minor variance · Deferred
    To legalize and to maintain a one-storey rear addition and to construct a one-storey addition along the south side of the building.
    File A0144/24EYK · submitted Feb 28, 2024

Development Applications; Committee of Adjustment Applications · 3 registered short-term rentals within 250 m.

04City services

ItemFindingPrecisionSource · as of
Garbage dayNovember 11, 2026This addressCollection calendar Wednesday 2
Next recyclingNovember 18, 2026This addressSolid Waste Collection Schedule
City councillorAmber MorleyWard 3Councillor_Morley@toronto.ca · 416-397-9273

05Quick answers about 950 Kipling Ave

Is 950 Kipling Ave in a flood plain?

No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.

What is being built near 950 Kipling Ave?

6 active development applications within 250 metres, the closest at 970 Kipling Ave (125 m). Source: Development Applications.

When is garbage day at 950 Kipling Ave?

Collection calendar Wednesday 2. Next garbage pickup: Nov 11, 2026. Source: Solid Waste Collection Schedule.

Answers are generated from the data on this page and update when the data changes.

06From the archives

Looking southwest from Kipling Avenue CPR overpass, along CPR tracks to St. Albans Road, Munster Avenue extension at left
Looking southwest from Kipling Avenue CPR overpass, along CPR tracks to St. Albans Road, Munster Avenue extension at left, 1975. City of Toronto Archives, Fonds 1257, Series 1057, Item 8742. 34 m away.
Looking southwest from Kipling Avenue CPR overpass, along CPR tracks to St. Albans Road, Kipling Lumber at right
Looking southwest from Kipling Avenue CPR overpass, along CPR tracks to St. Albans Road, Kipling Lumber at right, 1975. City of Toronto Archives, Fonds 1257, Series 1057, Item 8741. 51 m away.
Looking northeast on St. Albans Road to Kipling Avenue
Looking northeast on St. Albans Road to Kipling Avenue, 1975. City of Toronto Archives, Fonds 1257, Series 1057, Item 8764. 51 m away.
Looking northeast on St. Albans Road to Kipling Avenue
Looking northeast on St. Albans Road to Kipling Avenue, 1975. City of Toronto Archives, Fonds 1257, Series 1057, Item 8765. 51 m away.
Looking southwest from Kipling Avenue CPR overpass, along Munster Avenue extension
Looking southwest from Kipling Avenue CPR overpass, along Munster Avenue extension, 1975. City of Toronto Archives, Fonds 1257, Series 1057, Item 8740. 101 m away.
Looking west from Kipling Avenue C.P.R. overpass towards southwest end of St. Alban's Road (Munster Avenue extension in foreground)
Looking west from Kipling Avenue C.P.R. overpass towards southwest end of St. Alban's Road (Munster Avenue extension in foreground), 1975. City of Toronto Archives, Fonds 1257, Series 1057, Item 8739. 101 m away.
Vicinity of Kipling Avenue and Dundas Street West, looking north of Kipling Avenue, towards St. Albans Road (Munster Avenue extension on left)
Vicinity of Kipling Avenue and Dundas Street West, looking north of Kipling Avenue, towards St. Albans Road (Munster Avenue extension on left), 1975. City of Toronto Archives, Fonds 1257, Series 1057, Item 8738. 127 m away.
27 St. Albans Road
27 St. Albans Road, 1975. City of Toronto Archives, Fonds 1257, Series 1057, Item 8766. 137 m away.
Looking towards Dundas Street West, west of Kipling Avenue
Looking towards Dundas Street West, west of Kipling Avenue, 1975. City of Toronto Archives, Fonds 1257, Series 1057, Item 8743. 204 m away.

Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location