97 Glen Rd
A property on the Heritage Register (Part V), outside TRCA flood and shoreline hazard areas, with 1 active development application within 250 metres.
Data as of Nov 8, 2026 · Every item lists its source
- On the Heritage Register (Part V).
- Outside TRCA flood and shoreline hazard areas.
- 1 active development application and 1 Committee of Adjustment application within 250 m.
01The building
Recent permits (4)
- Building Permit Related(MS) · Permit Issued · Aug 6, 2024
HVAC - Proposed interior alterations to existing 2 1/2 storey single family dwelling and a new north deck. · Permit 24 142286 HVA - Building Permit Related(PS) · Permit Issued · Aug 1, 2024
Plumbing - Proposed interior alterations to existing 2 1/2 storey single family dwelling and a new north deck. · Permit 24 142286 PLB - Multiple Projects · Inspection · Jul 31, 2024
Proposed interior alterations to existing 2 1/2 storey single family dwelling, additional finished basement to existing un excavated area and a new north porch. · Permit 24 142286 BLD - Porch · Closed · Nov 21, 2014
Proposal to repair first and second floor porch on the side of the house. · Permit 14 209154 BLD
02Risks and the ground
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
03What’s changing nearby
- 199 Glen Rd · 159 m · Condominium · Draft Plan ApprovedCreate 4 residential units within an existing four storey buildingFile 26 125641 STE 11 CD · submitted Mar 6, 2026 · City record
- 283 Glen Rd · 66 m · Committee of Adjustment · Minor variance · Hearing ScheduledTo alter the existing three-storey detached dwelling by constructing a rear two-storey addition with a basement extension, a rear one-storey addition, a one-storey addition to the existing bay on the south side, a rear second storey…File A0704/26TEY · submitted Oct 5, 2026
Development Applications; Committee of Adjustment Applications · 1 registered short-term rentals within 250 m.
04City services
05Quick answers about 97 Glen Rd
Is 97 Glen Rd in a flood plain?
No. It is outside TRCA's mapped flood and shoreline hazard areas. Source: TRCA Regulation mapping 2025.
What is being built near 97 Glen Rd?
1 active development application within 250 metres, the closest at 99 Glen Rd (159 m). Source: Development Applications.
When is garbage day at 97 Glen Rd?
Collection calendar Wednesday 1. Next garbage pickup: Nov 18, 2026. Source: Solid Waste Collection Schedule.
Answers are generated from the data on this page and update when the data changes.
06From the archives







Photo locations are matched from each photo’s title against City street and address data, so some may be off. Report a wrong location