40 University Ave
40 University Ave is in Yonge-Bay Corridor, on the City's Heritage Register. An 80‑storey building with 569 homes and shops is under appeal 184 m away.
Data as of Nov 12, 2026 · Every item lists its source
- It is in a Heritage Conservation District (Union Station) (Part V).
- A public hearing on Nov 25 about an addition at 155 Wellington St W, 110 m away.
- An 80-storey building with 569 homes and shops is under appeal, 184 m away.
- Assaults, break-ins, robberies and thefts over $5,000 in Yonge-Bay Corridor were above the Toronto rate in 2025.
- 11 collisions killed or seriously injured someone within 500 m since 2021; 6 involved pedestrians.
01What’s planned near 40 University Ave
5 planning proposals within 250 m (about a 3‑minute walk), all in progress. A proposal that covers several addresses or City files is listed once. That's more than at 91% of Toronto addresses.
In progress
- 1Addition155 Wellington St W · 110 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
A public hearing is set for Nov 25, 2026 at 9:30 a.m. Neighbours can send comments or speak at the hearing.
To alter the existing 42-storey mixed-use building by constructing a side (west) one-storey addition (to enclose the existing patio with two new side (west) principal entrances for the existing eating establishment), abutting Wellington…File A0566/26TEY · submitted Jul 20, 2026 · look it up on the City’s Application Information Centre - 280-storey building · 569 homes and shops212 King St W and 4 more addresses · 184 m away3 City files for one project: Rezoning · Site plan · Subdivision569 homes99,987 m² of floor space
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Proposal for an 80-storey mixed-use building containing 569 rental dwelling units (down from 588 in the initial application). The proposed building will have a non-residential gross floor area of 81,535 square metres (up from 75,002…All 5 addresses
212 King St W · 214-218 King St W · 214 King St W · 218 King St W · 220 King St W
File 20 227738 STE 10 OZ (rezoning) · submitted Dec 10, 2020 · City record and how to commentFile 21 166710 STE 10 SA (site plan) · submitted Jun 7, 2021 · City record and how to commentFile 21 234759 STE 10 SB (subdivision) · submitted Nov 5, 2021 · City record and how to comment - 361-storey building · 526 homes and shops211 Adelaide St W and 1 more address · 207 m awaySite plan: City review of the design and layout of a new building526 homes
City planners have been reviewing it since 2022. Residents can comment before a decision is made.
Site Plan Approval application for a 61-storey mixed-use building having a non-residential gross floor area 22,601 square metres, and a residential gross floor area of 44,683 square metres. A total of 526 rental dwelling units are…File 22 119164 STE 10 SA · submitted Mar 3, 2022 · City record and how to commentAll 2 addresses
- 465-storey building with shops53 Simcoe St and 2 more addresses · 234 m awayRezoning: a request to change the Official Plan or zoning so something new can be built
City planners have been reviewing it since 2024. Residents can comment before a decision is made.
Combined Official Plan Amendment (OPA) & Zoning By-law Amendment (ZBA) application for a proposal to amend By-law 1015-2022, the proposed 65-storey residential tower with ground floor retail. The proposal includes 54,010 sqaure metres of…Public notice · Nov 15, 2024Notice of Application - Under the Planning Act - 145 Wellington Street West and 53-55 Simcoe Street. Read the notice, which explains any meeting or appeal dates.File 24 229071 STE 10 OZ · submitted Oct 21, 2024 · City record and how to commentAll 3 addresses
- 552-storey building with shops145 Wellington St W · 238 m awaySite plan: City review of the design and layout of a new building
City planners have been reviewing it since 2020. Residents can comment before a decision is made.
Site Plan Control Application to facilitate a new mixed-use building comprised of a 13-storey podium, and a 52-storey residential tower above. Proposal includes 14,662 m² non-residential floor area and 472 new purpose-built rental units.…File 20 191102 STE 10 SA · submitted Sep 8, 2020 · City record and how to comment
Development Applications and Committee of Adjustment Applications, City of Toronto. A proposal that covers several addresses or City files is listed once. Inactive: the City’s file is still open but marked inactive. Decided: development files submitted in the last 4 years; Committee of Adjustment decisions in the last 2 years.
Noise permits nearby
- Forma Tower · 266 King St W
Construction · EllisDonFeb 1, 2026 to Feb 1, 2027 · 7 to 7 am
303 m away - Forma by Frank Gehry · 266 King St W
Continuous concrete pour · GG DuncanSept 2, 2026 to Feb 27, 2027
303 m away - FORMA East Tower · 266 King St W
Construction · EllisDonNov 3, 2026 to Jan 1, 2027 · 6 am to 11 pm
303 m away - Move out of display vehicles · 255 Front St W
OtherFeb 21 to Feb 22 · 6 pm to 5 am
289 m away
City of Toronto Noise Exemption Permits: permits that let a site go past the noise bylaw’s limits for a set time (amplified sound for an event, construction outside normal hours, a concrete pour). Upcoming and current permits within 600 m. Events run by individuals show their name only for street parties, festivals and markets.
02Street work near 40 University Ave
5 City road or sidewalk projects are planned within 500 m. The closest: road resurfacing on Duncan St, Adelaide St W to Nelson St, Q1 to Q4 2027.
Source: City of Toronto Road Reconstruction, Road Resurfacing and Sidewalk Construction programs (planned work within 500 m), and Utility Cut Permits. Dates are the City’s plan and can move. “Carried over” means the work was due earlier and is still listed.
03Safety near 40 University Ave
Police recorded 433 major crimes within 500 m of this address from Oct 2025 to Sep 2026. That's more than at almost all Toronto addresses. The table compares the neighbourhood's rates with Toronto's.
Yonge-Bay Corridor compared with Toronto · rate per 100,000 residents, 2025
| Major crime | Near this addresswithin 500 m, last 12 months | Compared with the Toronto rate | Difference |
|---|---|---|---|
| Assaults | 318 near this address | 338% higher3,361 vs 768 per 100,000 | |
| Robberies | 17 near this address | 282% higher300 vs 79 per 100,000 | |
| Thefts over $5,000 | 34 near this address | 246% higher210 vs 61 per 100,000 | |
| Break-ins | 48 near this address | 191% higher552 vs 190 per 100,000 | |
| Car thefts | 16 near this address | 28% lower162 vs 225 per 100,000 |
Source: Toronto Police Service Public Safety Data Portal, Major Crime Indicators (Oct 5, 2025 to Sep 30, 2026) and Neighbourhood Crime Rates. Reported incidents only; police place each incident at the nearest intersection. Five-year trends for Yonge-Bay Corridor
Traffic safety
11 collisions killed or seriously injured someone within 500 m since 2021; 6 involved pedestrians, 5 involved cyclists and 1 was fatal. Most were on Bay St and Front St W. Yonge-Bay Corridor has more of these collisions per resident than almost anywhere in Toronto.
- King St W at Simcoe St · Cyclist, seriously injured · Jun 30, 2026 · 197 m
- Bay St at Front St W · Cyclist, seriously injured · Aug 16, 2025 · 437 m
- Front St W at Bay St · Pedestrian, seriously injured · Jul 31, 2025 · 451 m
- Adelaide St W at Private Lane 188 University Ave · Cyclist, seriously injured · May 31, 2024 · 338 m
Source: Toronto Police Service, collisions in which someone was killed or seriously injured (since 2021, within 500 m); City of Toronto School Safety Zones and Traffic Calming Database.
Other crimes near this address
| Last 12 months | Within 500 m | Yonge-Bay Corridor, per 100,000 residents | Compared with other neighbourhoods |
|---|---|---|---|
| Shootings and firearm discharges | 0 | 0 | Lower than most |
| Bicycle thefts | 49 | 720 | Higher than most |
| Thefts from vehicles | 33 | 593 | Higher than most |
Toronto Police Service: Shootings and Firearm Discharges, Bicycle Thefts and Theft From Motor Vehicle, June 2025 to June 2026. Police place each incident at the nearest intersection.
04Getting around from 40 University Ave
The nearest subway station is St Andrew Station (Line 1), about a 3‑minute walk (0.2 km). Within a 5‑minute walk there are 5 TTC stops served by the 504, 503 and 501 streetcars, with about 2,015 departures on a typical weekday. The nearest GO train station is Union Station GO, 0.3 km away, with 354 train stops on a weekday.
Source: TTC · Line 1 · about 3 min walk
Source: GO Transit · 354 train stops on a weekday
TTC and GO Transit schedules for a typical weekday (Nov 18, 2026). Walking times are estimates. Bike Share Toronto station data; City of Toronto Cycling Network and Permit Parking Areas.
How reliable are your routes?
| Route | Delays reported | Per 1,000 trips | Compared with other TTC routes |
|---|---|---|---|
| 504 | 1,782 | 7.1 | more than most routes |
| 503 | 881 | 7.2 | more than most routes |
| 501 | 2,049 | 10.7 | more than most routes |
TTC Bus and Streetcar Delay Data, September 2025 to September 2026: incidents the TTC logged as delaying service. Per 1,000 trips uses each route’s weekday schedule, so busy routes aren’t penalized for running more vehicles. A typical route: 4.0.
Charging and bike parking
- EV charging: 40 York St
City-run (Green P): 12 Level 2 ports. Next: Toronto City Hall, 100 Queen St W, 758 m.123 m - Indoor bike station: Union Station
Secure parking for 160 bikes.209 m
City of Toronto: City-operated EV charging stations (private chargers aren’t included); indoor bike stations, shown within 1.5 km.
05Schools and child care near 40 University Ave
The closest public and Catholic schools. They may not be the ones assigned to this address; check with the Toronto District School Board (TDSB) or Toronto Catholic District School Board (TCDSB).
Elementary schools
Share of Grade 6 students meeting the provincial standard. Toronto: 87% reading, 54% math.
Secondary schools
Share of students who passed the Grade 10 literacy test on their first try. Toronto: 84%.
The red tick on each bar is the Toronto average. Private schools within 1 km: Keystone International Schools. Source: Ontario Ministry of Education (2026), EQAO results.
Within 500 m (about a 6‑minute walk): seven licensed child care centres and no EarlyON centres.
Last health inspection Jan 30, 2026: pass (fail to provide an ipac sink equipped with paper towels; fail to provide current written policies on management and reporting of communicable disease).
Last health inspection Jan 6, 2026: pass (fail to provide current written policies on infection prevention and control).
Last health inspection Jan 30, 2026: pass.
Source: City of Toronto Licensed Child Care Centres, EarlyON Child and Family Centres, and ChildCareSafe (Toronto Public Health inspections).
06Parks, trees and libraries near 40 University Ave
There are 4 parks within 500 m. The nearest pool is Harrison Pool, 764 m away.
Parks and community centres within 500 m
- Simcoe Park · 240 Front St W · 243 m
- David Pecaut Square · 215 King St W · 294 m
- Olympic Park · 222 Bremner Blvd · 366 m
- Isabella Valancy Crawford Park · 299 Front St W · 455 m
- Bobbie Rosenfeld Park · 294 Bremner Blvd · 545 m
Pools, courts and more
Also nearby
Source: City of Toronto Parks and Recreation Facilities, Registered Programs and Drop-In Programs, Tennis Courts, Outdoor and Indoor Ice Rinks, Washroom Facilities, Off-Leash Areas, Street Tree Data; Toronto Public Health SwimSafe and Beach Water Quality; Toronto Public Library branches.
Park space
Park projects nearby
- New Park at 229 Richmond Street West
A new 2,600m2 park is coming to 229 Richmond St. W. The park site is currently leased to a restaurant and used as an outdoor patio.In progress · 560 m - Rees Street Park
A new park is coming to 318 Queens Quay. Learn more about the project and how you can get involved.In progress · 855 m - New Park at 105 Spadina Avenue
A new 1,000 m2 park is coming to 105 Spadina Ave., at the southeast corner of Spadina Avenue and Adelaide Street.In progress · 867 m - New Park on St. Patrick Street
A new park is coming to 234 Simcoe St as part of the Relic Linear Park System. Learn more about the project and how you can get involved.In progress · 896 m - Toronto Island Park Projects
Following City Council’s adoption of the Toronto Island Park Plan in July 2024, the City is moving forward with projects to enhance and protect the park over time, guided by the plan’s long-term vision.In progress · 962 m
City of Toronto: Green Spaces (parks, natural areas and conservation land; hydro corridors, golf courses, cemeteries and road verges aren’t counted); Park and Recreation Facility Projects within 1.5 km.
07The building at 40 University Ave
There are no building orders or short-term rental registrations on record for 40 University Ave. Here is what the City does have.
Source: Building Permits · 212 on record
- Property standards, opened Jan 9, 2026: closed
Source: Municipal Licensing and Standards investigations · complaints and the City’s follow-up
Source: Heritage Register
Permit history: 10 projects from 25 permits (most recent 25 of 212)
- Building work · application on hold · issued Sep 29, 2026
Construct a demountable seasonal vestibule enclosure at the Beertown Public House main entrance, using aluminum tube framing anchored to the existing concrete slab; no structural modifications to… · Permit 26 245997 - Interior Alterations · permit issued · issued Jun 5, 2026
Repairs to the 3rd and 5th floor structural slabs · Permit 26 155144 - Interior Alterations · permit issued · issued Jan 9, 2026
Proposal for interior alterations to 10th floor elevator lobby, corridor and washrooms · 3 permits in this project (such as building, plumbing and heating) · Permit 25 259333 - Interior Alterations · completed Feb 20, 2026
Proposal for interior alterations for office fit-out. · 3 permits in this project (such as building, plumbing and heating) · Permit 25 192086 - Interior Alterations · completed Mar 24, 2026
Proposal for interior alterations fit-out of an existing office suite · 3 permits in this project (such as building, plumbing and heating) · Permit 25 192204 - Interior Alterations · completed May 21, 2026
REVISION - alterations to existing sprinkler system to suit new layoutProposed interior alterations to office · 4 permits in this project (such as building, plumbing and heating) · Permit 24 237609 - Interior Alterations · completed Jun 18, 2024
new low partitions, new equipment, new service counter PLB and HVA · 3 permits in this project (such as building, plumbing and heating) · Permit 24 122262 - Interior Alterations · completed Nov 14, 2024
Proposal for interior alterations to an existing office space, Suite 603 for office tenant - 'Morguard'. · 3 permits in this project (such as building, plumbing and heating) · Permit 24 114509 - Sign Building Permit Related · completed Sep 1, 2026
Application for a permit to erect and display one illuminated overhanging structure sign.*****DOUGH BOX***** · Permit 23 140795 - Interior Alterations · completed Oct 31, 2024
REV 01 - Revision to new sink in the north wing of the officeNew partitions and kitchen sink within the exiting office space in Unit 1300 · 3 permits in this project (such as building, plumbing and heating) · Permit 22 225152
The lot
Measured from the City’s property boundary map. It’s compiled from records of varying age, so treat these as approximate; a survey is the legal measure.
Green roof and solar permits
No green roof or solar hot water permits at this address. Within 500 m: 17 with a green roof.
City of Toronto Building Permits: Green Roofs, and Solar Hot Water Heaters.
08What can be built at 40 University Ave
CR (Commercial Residential) zoning allows shops and offices on the ground floor with homes above, typical of main streets. The numbers below are the main limits; the full rules depend on the lot.
Source: Zoning By-law 569-2013, chapter 40
Source: Height overlay
Source: Zone label (d)
Source: Zone label (x)
Special areas
Source: City of Toronto Zoning By-law 569-2013 (zone, height and lot coverage overlays), Heritage Conservation Districts, Major Transit Station Areas, Secondary Plans and Archaeological Potential. This is a summary, not a zoning review. Read the by-law and see the City’s map.
09Around the block
Stays of less than 28 days, like Airbnb. That's about typical for Toronto (the typical address has 2).
Houses that rent individual rooms with shared kitchens or bathrooms. The City licenses them to enforce safety standards.
Pokerrito (take-out or food shop), Blondies Pizza Bay Street (take-out or food shop), The Daily Dumpling Wonton (take-out or food shop), and 20 more.
70 York Street (120 m), 123 Front Street West (164 m), 100 Wellington Street West (184 m), and 18 more.
Homes in City-backed affordable housing projects that are approved or under way.
All new business licences in Yonge-Bay Corridor (23)
- Pokerrito · Take-out or food shop · 145 King St W · 163 m · licensed Nov 10, 2026
- Blondies Pizza Bay Street · Take-out or food shop · 598 Bay St · 1102 m · licensed Nov 10, 2026
- The Daily Dumpling Wonton · Take-out or food shop · 181 Bay St · 426 m · licensed Nov 6, 2026
- Mimuchas Place · Take-out or food shop · 123 Queen St W · 605 m · licensed Nov 5, 2026
- Shawarma Royale · Restaurant or bar · 366 Yonge St · 1391 m · licensed Nov 5, 2026
- Jacked Up Coffee · Take-out or food shop · 120 Adelaide St W · 452 m · licensed Nov 4, 2026
- Concord Room · Restaurant or bar · 40 Temperance St · 639 m · licensed Nov 1, 2026
- Galbi BBQ Rice Bowl · Take-out or food shop · 444 Yonge St · 1623 m · licensed Oct 20, 2026
- Marry Me Mochi Eaton Centre · Take-out or food shop · 220 Yonge St · 917 m · licensed Oct 15, 2026
- Impark · Parking lot · 1 Dundas St W · 1121 m · licensed Oct 15, 2026
- Flamin Skewer · Take-out or food shop · 145 King St W · 163 m · licensed Oct 10, 2026
- Rosie's Burgers · Take-out or food shop · 100 King St W · 374 m · licensed Oct 9, 2026
Affordable housing projects within 500 m (6)
| Address | Stage | Affordable homes | Distance |
|---|---|---|---|
| 212 King St W | Rezoning approved | 11 | 245 m |
| 100 Simcoe St | Application under review | 28 | 307 m |
| 200 University Ave | Application under review | 24 | 444 m |
| 315 Front St W | Rezoning approved | 32 | 479 m |
| 315 Front St W | Rezoning approved | 16 | 479 m |
| 260 Adelaide St W | Rezoning approved | 254 | 486 m |
Source: Affordable Housing Pipeline, Rental Housing Demolition and Conversion applications, Short Term Rentals Registration, Multi-Tenant (Rooming) House Licences, Business Licences and Permits (storefront types; owners’ personal names are never shown), POPS, and Daily Shelter Occupancy (Nov 10, 2026). Confidential shelter locations are not published.
Traffic on your street
City of Toronto Transportation Services: speed, volume and classification counts since 2016.
Parking tickets on this block
322 tickets in 2025 on University Ave between numbers 0 and 90: 270 for other parking offences, 18 for parking on a boulevard or private property.
City of Toronto Parking Tickets, 2025. Placed by the street address the officer recorded.
Main street business area
Financial District BIA, which includes this address. Business Improvement Areas are local business associations that run street events and improvements.
City of Toronto Business Improvement Areas, within 400 m.
What neighbours report to 311
In the last 12 months, 1,733 service requests came from postal area M5J, which includes 40 University Ave. The most common:
| Illegal dumping | 186 | |
| Amplified music or instrument noise | 153 | |
| Posters on City property | 96 | |
| Injured wildlife | 64 | |
| Taxi or limo complaint | 63 | |
| Sidewalk cleaning | 61 |
City of Toronto 311 Service Requests, October 2025 to October 2026. 311 publishes only the first three characters of the postal code, so this covers the wider postal area. Counts reflect how often people call as well as how often problems happen.
10Risks and environment at 40 University Ave
Source: TRCA Regulation mapping 2025
Source: Non Regulated Lead Sample · 15 tests, Dec 13, 2014 to Mar 9, 2020
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
11The neighbourhood: Yonge-Bay Corridor
Yonge-Bay Corridor had 12,645 residents in 2021. The median household income was $68,500, lower than the typical Toronto neighbourhood ($85,000). 68% of households rent (typical neighbourhood: 46%). 56% of renters spend 30% or more of their income on housing. 21% of workers commuted by transit and 56% walked or cycled (typical neighbourhood: 26% and 5%). The most common first languages other than English and French are Mandarin (14.7%), Cantonese (5.2%) and Arabic (4.8%). Source: 2021 Census; the next census was taken in 2026.
Rents aren't published for single neighbourhoods. Across central Toronto (the old City of Toronto, before the 1998 amalgamation), a two-bedroom in a purpose-built rental building averaged $2,457 a month in October 2025, up 6% from a year earlier. The Toronto average was $2,055. The vacancy rate was 3.2%. These averages include long-term tenants; new listings usually cost more.
| Average rent, October 2025 | Central Toronto | Change in a year | Toronto |
|---|---|---|---|
| Studio | $1,526 | +2% | $1,499 |
| 1 bedroom | $1,914 | +4% | $1,763 |
| 2 bedrooms | $2,457 | +6% | $2,055 |
| 3 bedrooms or more | $3,195 | 0% | $2,361 |
Source: CMHC, Rental Market Survey (October 2025), purpose-built rental apartments, central Toronto (the old City of Toronto, before the 1998 amalgamation). CMHC doesn’t publish rents for single neighbourhoods. Adapted by My Address in Toronto.
How Yonge-Bay Corridor compares with the rest of Toronto →Handy info
Councillor: Ausma Malik, Ward 10 Spadina-Fort York · Councillor_Malik@toronto.ca · 416-392-4044
Source: Solid Waste Collection Schedule; City of Toronto elected officials, as of Nov 12, 2026.
Archive photos from near this address: myaddressintoronto.com/address/40-university-ave#sec-history








