Minor variance
1286 Bloor St W · Junction-Wallace Emerson · Ward 9 Davenport
The owner is asking for exceptions to the zoning rules to alter the existing four-storey mixed-use building by constructing two mechanical penthouse enclosures (including rooftop access). The Committee of Adjustment hears it on Wednesday, November 25. Neighbours can send comments or speak at the hearing.
City file A0648/26TEY · Data as of Nov 13, 2026 · Every item lists its source
- SubmittedSep 2, 2026
- Notice to neighboursHearing scheduled
- NowComments open until Nov 18
- NextHearing Nov 25
- ThenDecision; appeals until Dec 15
01Have your say
- Write your comments, mentioning file A0648/26TEY and the address.
- Email them as a PDF to the Committee of Adjustment (Toronto and East York panel) by the deadline. How to submit, on the City’s site
- To speak at the hearing, online or in person, register with the Committee. How to take part
02What’s proposed
To alter the existing four-storey mixed-use building by constructing two mechanical penthouse enclosures (including rooftop access), and a partially covered rooftop terrace with a trellis (above the fourth storey). The ground level and second level will contain one commercial unit (art gallery and event space). The third level will contain a multi-functional commercial space for youth programming, as well as amenity space for building residents (including counselling rooms, a gym, a break room, and an open-concept collaboration space). There will be a total of eight residential dwelling units located on the fourth level for youth transitioning from the Ontario Child Protection Services foster care system.
The application’s description, from the City’s Committee of Adjustment data. A minor variance is permission for a small exception to the zoning rules, such as height or lot coverage.
03Timeline
- Sep 2, 2026Application submitted to the City.
- Nov 25, 2026Committee of Adjustment hearing.
04City files and documents
| Type | File | Status | |
|---|---|---|---|
| Minor variance | File A0648/26TEY | In progress | The City’s Application Information Centre |
Plans, studies and staff reports are on the City’s Application Information Centre. We link to them rather than copy them.
05Nearby applications
The red dot is this application. The circle shows 400 metres, about a 5-minute walk.
- 1
- 2
- 3
- 4
- 5
06Quick answers about this application
When is the Committee of Adjustment hearing for 1286 Bloor St W?
Wednesday, November 25, 2026, at 9:30 a.m., online or at Committee Room 2, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2. Source: Committee of Adjustment Applications, as of Nov 13, 2026.
What is the deadline to comment?
4:30 p.m., Wednesday, November 18, 2026: five business days before the hearing. Email comments as a PDF to the Committee of Adjustment. Source: City of Toronto, Committee of Adjustment participation rules.
What is being built at 1286 Bloor St W?
To alter the existing four-storey mixed-use building by constructing two mechanical penthouse enclosures (including rooftop access), and a partially covered rooftop terrace with a trellis (above the fourth storey). The ground level and second level will… (file A0648/26TEY). Source: Committee of Adjustment Applications, as of Nov 13, 2026.
Who is the councillor for 1286 Bloor St W?
Alejandra Bravo, Ward 9 Davenport. Source: City Wards and Councillors, as of Nov 13, 2026.
Sources: City of Toronto Development Applications, Committee of Adjustment Applications, Public Notices and Building Permits (Open Data, updated nightly). Not legal advice. Something wrong? Tell us.