The owner is asking for exceptions to the zoning rules to legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. A hearing date hasn’t been set yet.

City file A0068/25TEY · Data as of Nov 13, 2026 · Every item lists its source

Where it is in the process
  1. SubmittedJan 27, 2025
  2. NowWaiting for a hearing date
  3. NextHearing and decision

01Have your say

Waiting for a hearing date

Neighbours get a notice in the mail once a hearing is set, and can send comments before it. Follow this application and we’ll email you the date.

02What’s proposed

To legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. The ground level garage within the ancillary building was converted into an additional residential dwelling unit. There will be a total of four residential dwelling units on this lot (two units within the main dwelling and two units within the ancillary building).

The application’s description, from the City’s Committee of Adjustment data. A minor variance is permission for a small exception to the zoning rules, such as height or lot coverage.

03Timeline

  1. Jan 27, 2025Application submitted to the City.

04City files and documents

TypeFileStatus
Minor varianceFile A0068/25TEYIn progressThe City’s Application Information Centre

Plans, studies and staff reports are on the City’s Application Information Centre. We link to them rather than copy them.

05Nearby applications

Lansdowne AveDupont StDufferin StLappin AveMillicent StEmerson AveSt Clarens AveHallam StArmstrong AveWallace Ave123456Map data: City of Toronto (Toronto Centreline)Millicent StEmerson AveWallace AveLappin Ave123456Map data: City of Toronto (Toronto Centreline)

The red dot is this application. The circle shows 400 metres, about a 5-minute walk.

  1. 1
    Subdivision (2,846 homes)
    1245 Dupont St · about 70 m

    City planners are reviewing it

  2. 2
    Part lot control
    1245 Dupont St · about 70 m

    City planners are reviewing it

  3. 3
    50-storey building (588 homes)
    1245 Dupont St · about 70 m

    City planners are reviewing it

  4. 4
    13-storey building (3,547 homes)
    1260 Dufferin St · about 160 m

    Appealed to the Ontario Land Tribunal

  5. 5
    Site plan
    259 Geary Ave · about 220 m

    City planners are reviewing it

  6. 6
    Add a storey
    1341 Dupont St · about 350 m

    Waiting for a hearing date

All applications in progress in Ward 9

06Quick answers about this application

What is being built at 98 Millicent St?

To legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. The ground level garage within the ancillary building was… (file A0068/25TEY). Source: Committee of Adjustment Applications, as of Nov 13, 2026.

Who is the councillor for 98 Millicent St?

Alejandra Bravo, Ward 9 Davenport. Source: City Wards and Councillors, as of Nov 13, 2026.

Sources: City of Toronto Development Applications, Committee of Adjustment Applications, Public Notices and Building Permits (Open Data, updated nightly). Not legal advice. Something wrong? Tell us.

98 Millicent St Committee of Adjustment: Laneway suite · My Address in Toronto