Planning application · Site plan

Site plan

2 Union St · Weston-Pelham Park · Ward 9 Davenport

A request to approve the detailed design of the site at 2 Union St. It was submitted in December 2022 and City planners are reviewing it.

City file 22 239951 STE 09 SA · Data as of Nov 13, 2026 · Every item lists its source

Where it is in the process
  1. SubmittedDec 15, 2022
  2. NowCity planners’ review
  3. NextCity decision

01Have your say

No meeting scheduled right now

While City planners review it, you can send comments to the planner named on the City’s application page. Your councillor, Alejandra Bravo, can also hear your views.

Follow this application and we’ll email you when a meeting or decision is scheduled.

02What’s proposed

The applicant’s description
Proposed St. Clair - Old Weston GO station (Smart Track) by Metrolinx. Proposal comprises:- 3 entrance buildings: main entrance located at south end of site adjacent to Union St. Seconary entrance at north end of sit adjacent to Union St. Third entrance located on west side of rail corridor near planned extension of Gunns Rd.- Increase from three tracks to four mainline tracks- Three platforms to serve all four Metrolinx tracks, with canopies over at least 85% of the platformlength, enclosures at the top of stairs and elevators, passenger shelters, and all amenities such aslighting, public address, digital and static signage, and snowmelt.- Two tunnels to connect each of the platforms to a station building on the east side of the rail corridor.- Corridor station facilities including six-bay bus loop to accommodate TTC vehicle and Wheel Trans, aplaza, sidewalk, MUP and circulation space to accommodate all pedestrian and cycling activity,secure and covered cycling facilities, as well as landscaping, street furniture and plantings.
From the City’s development applications data, as written.

03Timeline

  1. Dec 15, 2022Application submitted to the City.

04City files and documents

TypeFileStatus
Site planFile 22 239951 STE 09 SAIn progressDocuments and reports on the City’s site
SubdivisionFile 21 235877 STE 09 SBIn progressSee its page
RezoningFile 21 235872 STE 09 OZUnder appealSee its page

Plans, studies and staff reports are on the City’s Application Information Centre. We link to them rather than copy them.

Earlier at this address

05Elsewhere on this site

New-building and demolition permits at 2 Union St since this application was filed.

  1. •
    New building
    Permit 24 253151 BLD

    Permit applied for Dec 23, 2024

    New Main Entrance Building, Secondary Entrance Building, Gunns Road Sloped Pathway with two connected Pedestrian Tunnels access to the two Platforms. A new St. Clair Ave West pedestrian sloped pathway access connecting t

06Nearby applications

Weston RdSt Clair AveOld Weston RdKeele StDavenport RdGunns RdBirdstone CresLloyd AveMulock AveFord StTownsley StConnolly StOld Stock Yards Rd123456Map data: City of Toronto (Toronto Centreline)Weston RdKeele StSt Clair AveLloyd AveTownsley St123456Map data: City of Toronto (Toronto Centreline)

The red dot is this application. The circle shows 400 metres, about a 5-minute walk.

  1. 1
    Three towers, up to 49 storeys (1,364 homes)
    2 Union St · next door

    Appealed to the Ontario Land Tribunal

  2. 2
    Subdivision
    2 Union St · next door

    City planners are reviewing it

  3. 3
    Minor variance
    611 Keele St · about 50 m

    Appealed to the Toronto Local Appeal Body

  4. 4
    39-storey building with shops (1,951 homes)
    77 Union St · about 110 m

    City planners are reviewing it

  5. 5
    Subdivision
    77 Union St · about 110 m

    City planners are reviewing it

  6. 6
    Site plan (1,951 homes)
    77 Union St · about 110 m

    City planners are reviewing it

All applications in progress in Ward 9

07Quick answers about this application

What is proposed at 2 Union St?

Site plan, under City file 22 239951 STE 09 SA. Source: Development Applications, as of Nov 13, 2026.

Has the 2 Union St development been approved?

Not yet. City planners are reviewing it. Source: Development Applications, as of Nov 13, 2026.

Can I comment on it?

Yes. Send comments to the City planner named on the City’s application page before a decision. Follow the application to hear about meetings. Source: Development Applications and Public Notices, as of Nov 13, 2026.

Who is the councillor for 2 Union St?

Alejandra Bravo, Ward 9 Davenport. Source: City Wards and Councillors, as of Nov 13, 2026.