Skip to content
My Address in Toronto
Planning application · Site plan · Decided

8-storey building with shops

259 Geary Ave · Junction-Wallace Emerson · Ward 9 Davenport

A request to approve the detailed design of a 8-storey building. It was submitted in November 2024. It was approved.

City file 24 240290 STE 09 SA · Data as of Nov 13, 2026 · Every item lists its source

Where it is in the process
  1. SubmittedNov 18, 2024
  2. DecisionApproved
  3. ThenSite plan under review

01Outcome

DecidedApproved

This application is decided, so no more comments are taken on it.

What happens next: A site plan application was filed (26 244607 STE 09 SA); it’s in City files and documents. A building permit comes after it.

The City’s data shows the decision but not its date.

02What was proposed

One 8-storey building.

10 storeys8PROPOSED
Heights in storeys, from the application.
Height
8 storeys
Total floor space
22,734 m²
What it needed
Site plan approval (the City’s review of the detailed design)
The applicant’s description
Site Plan Approval for a 8-storey self-storage building with a total gross floor area of 22,734 square metres on the westerly portion of the subject lands containing 746.3 square metres of non-residential gross floor area including an ancillary retail, a medical clinic and an eating establishment use at-grade along Geary Avenue. The application also proposes a 260.8 square metres POPS along the western limit of the property. The proposal also includes partial demolition of a portion of the existing retail building currently occupied by The Brick.
From the City’s development applications data, as written.

03Timeline

  1. Nov 18, 2024Application submitted to the City.
  2. Sep 25, 2026A related site plan application is filed: Site plan.
  3. —Approved. Date not in the City’s data.

04City files and documents

TypeFileStatus
Site planFile 24 240290 STE 09 SAApprovedDocuments and reports on the City’s site
Site planFile 26 244607 STE 09 SAIn progressSee its page

Plans, studies and staff reports and the decision are on the City’s Application Information Centre. We link to them rather than copy them.

05Elsewhere on this site

New-building and demolition permits at 259 Geary Ave since this application was filed.

  1. •
    New building
    Permit 26 144071 BLD

    Permit applied for Apr 15, 2026

    Proposal to construct a new 8 storey self storage building with ground floor retail units and drive thru access

06Nearby applications

Dupont StDufferin StPrimrose AveSt Clarens AveEmerson AveGeary AveHallam StGladstone AveBartlett AveLappin Ave123456Map data: City of Toronto (Toronto Centreline)Dupont StDufferin StEmerson AveGeary AveLappin Ave123456Map data: City of Toronto (Toronto Centreline)

The red dot is this application. The circle shows 400 metres, about a 5-minute walk.

  1. 1
    Site plan
    259 Geary Ave · next door

    City planners are reviewing it

  2. 2
    Subdivision (2,846 homes)
    1245 Dupont St · about 190 m

    City planners are reviewing it

  3. 3
    Part lot control
    1245 Dupont St · about 190 m

    City planners are reviewing it

  4. 4
    50-storey building (588 homes)
    1245 Dupont St · about 190 m

    City planners are reviewing it

  5. 5
    Minor variance
    1278 Dupont St · about 220 m

    Hearing scheduled: hearing Wed, Nov 25

  6. 6
    Laneway suite
    98 Millicent St · about 220 m

    Waiting for a hearing date

All applications in progress in Ward 9

07Quick answers about this application

What is proposed at 259 Geary Ave?

One 8-storey building, 8 storeys, under City file 24 240290 STE 09 SA. Source: Development Applications, as of Nov 13, 2026.

Was the 259 Geary Ave development approved?

Yes. Approved. Source: Development Applications, as of Nov 13, 2026.

When will it be built?

No date yet. A site plan application was filed (26 244607 STE 09 SA); a building permit comes after it. None had been issued as of Nov 13, 2026. Source: Development Applications and Building Permits.

Who is the councillor for 259 Geary Ave?

Alejandra Bravo, Ward 9 Davenport. Source: City Wards and Councillors, as of Nov 13, 2026.

Sources: City of Toronto Development Applications, Committee of Adjustment Applications, Public Notices and Building Permits (Open Data, updated nightly). Not legal advice. Something wrong? Tell us.

259 Geary Ave development: 8-storey building with shops (approved) · My Address in Toronto