255 Front St W
255 Front St W is in Harbourfront-CityPlace. An 80‑storey building with 569 homes and shops is under appeal 159 m away.
Data as of Nov 11, 2026 · Every item lists its source
- An open by-law order for property standards (order issued Aug 10, 2025).
- A public hearing on Nov 25 about an addition at 155 Wellington St W, 214 m away.
- An 80-storey building with 569 homes and shops is under appeal, 159 m away.
- Lead in tap-water samples is higher than average in postal area M5V.
01What’s planned near 255 Front St W
12 planning proposals within 250 m (about a 3‑minute walk): ten in progress and two decided recently. Some cover several addresses; each proposal is listed once. That's more than at almost all Toronto addresses.
In progress
- 165-storey building with shops53 Simcoe St and 2 more addresses · 101 m awayRezoning: a request to change the Official Plan or zoning so something new can be built
City planners are reviewing it. Residents can comment before a decision is made.
Combined Official Plan Amendment (OPA) & Zoning By-law Amendment (ZBA) application for a proposal to amend By-law 1015-2022, the proposed 65-storey residential tower with ground floor retail. The proposal includes 54,010 sqaure metres of…Public notice · Nov 15, 2024Notice of Application - Under the Planning Act - 145 Wellington Street West and 53-55 Simcoe Street. Read the notice, which explains any meeting or appeal dates.File 24 229071 STE 10 OZ · submitted Oct 21, 2024 · City record and how to commentAll 3 addresses
- 252-storey building with shops145 Wellington St W · 126 m awaySite plan: City review of the design and layout of a new building
City planners are reviewing it. Residents can comment before a decision is made.
Site Plan Control Application to facilitate a new mixed-use building comprised of a 13-storey podium, and a 52-storey residential tower above. Proposal includes 14,662 m² non-residential floor area and 472 new purpose-built rental units.…File 20 191102 STE 10 SA · submitted Sep 8, 2020 · City record and how to comment - 3Subdivision212 King St W and 4 more addresses · 159 m awaySubdivision: a request to divide land into new lots and streets
City planners are reviewing it. Residents can comment before a decision is made.
Draft Plan of subdivison for 5 blocks.File 21 234759 STE 10 SB · submitted Nov 5, 2021 · City record and how to commentAll 5 addresses
212 King St W · 214-218 King St W · 214 King St W · 218 King St W · 220 King St W
Decided recently
- 11Site plan55 John St · 195 m awaySite plan: City review of the design and layout of a new building186 m² of floor space
City planners approved the site plan, with conditions to meet before a building permit.
Site Plan Approval for the relocation of Toronto Fire and Emergency Service Station 332 to the south side of Metro Hall.File 25 148717 STE 10 SA · submitted Apr 24, 2025 · City record and how to comment - 12Rezoning276 King St W · 211 m awayRezoning: a request to change the Official Plan or zoning so something new can be built
City Council approved it.
OPA and rezoning for amendments to modify the performance standards applicable to the mixed-use building to be located at 274-284 King Street West on the West Block, and on incorporating the minor variances approved for 270 King Street…Public notice · Nov 21, 2025Notice of Adoption of Official Plan Amendment 852 and Notice of Passing of Zoning By-Law 1388-2025 - 260, 270, 274, 276, 284, 300 and 322 King Street West. Read the notice, which explains any meeting or appeal dates.File 25 183702 STE 10 OZ · submitted Jun 25, 2025 · City record and how to comment
Development Applications and Committee of Adjustment Applications, City of Toronto. A proposal that covers several addresses is listed once. Decided: development files submitted in the last 4 years; Committee of Adjustment decisions in the last 2 years.
Noise permits nearby
- Forma Tower · 266 King St W
Construction · EllisDonFeb 1, 2026 to Feb 1, 2027 · 7 to 7 am
363 m away - Q Tower · 200 Queens Quay W
Continuous concrete pour · Rockwell Toronto ConstructionAug 28, 2026 to Feb 26, 2027
564 m away - Forma by Frank Gehry · 266 King St W
Continuous concrete pour · GG DuncanSept 2, 2026 to Feb 27, 2027
363 m away - Q Tower · 200 Queens Quay W
Construction · Rockwell Toronto ConstructionOct 9, 2026 to Feb 27, 2027 · 6 am to 5 pm
564 m away - FORMA East Tower · 266 King St W
Construction · EllisDonNov 3, 2026 to Jan 1, 2027 · 6 am to 11 pm
363 m away - Move out of display vehicles · 255 Front St W
OtherFeb 21 to Feb 22 · 6 pm to 5 am
0 m away
City of Toronto Noise Exemption Permits: permits that let a site go past the noise bylaw’s limits for a set time (amplified sound for an event, construction outside normal hours, a concrete pour). Upcoming and current permits within 600 m. Events run by individuals show their name only for street parties, festivals and markets.
02Street work near 255 Front St W
1 City road or sidewalk project is planned within 500 m. The closest: road resurfacing on Duncan St, Adelaide St W to Nelson St, Q1 to Q4 2027.
Source: City of Toronto Road Reconstruction, Road Resurfacing and Sidewalk Construction programs (planned work within 500 m), and Utility Cut Permits. Dates are the City’s plan and can move. “Carried over” means the work was due earlier and is still listed.
03Safety near 255 Front St W
Police recorded 270 major crimes within 500 m of this address from Oct 2025 to Sep 2026. That's more than at 98% of Toronto addresses. The table compares the neighbourhood's rates with Toronto's.
| Major crime | Near this addresswithin 500 m, last 12 months | Harbourfront-CityPlace compared with Torontorate per 100,000 residents, 2025 | |
|---|---|---|---|
| Assaults | 173 near this address | 15% higher883 vs 768 per 100,000 | |
| Thefts over $5,000 | 21 near this address | About the same57 vs 61 per 100,000 | |
| Break-ins | 52 near this address | 25% lower142 vs 190 per 100,000 | |
| Robberies | 9 near this address | 39% lower48 vs 79 per 100,000 | |
| Car thefts | 15 near this address | 75% lower57 vs 225 per 100,000 | |
Source: Toronto Police Service Public Safety Data Portal, Major Crime Indicators (Oct 4, 2025 to Sep 30, 2026) and Neighbourhood Crime Rates. Reported incidents only; police place each incident at the nearest intersection. Five-year trends for Harbourfront-CityPlace
Traffic safety
9 collisions killed or seriously injured someone within 500 m since 2021; 4 involved pedestrians, 4 involved cyclists and 1 was fatal. Most were on Lower Simcoe St and Wellington St W. Harbourfront-CityPlace has more of these collisions per resident than most neighbourhoods.
- F G Gardiner Xy W at Rees St · Motorcyclist, seriously injured · Sep 5, 2026 · 475 m
- King St W at Simcoe St · Cyclist, seriously injured · Jun 30, 2026 · 371 m
- Bremner Blvd at Van de Water Cres · Pedestrian, seriously injured · Sep 17, 2023 · 440 m
- Lower Simcoe St at Station St · Cyclist, seriously injured · Aug 25, 2023 · 159 m
Source: Toronto Police Service, collisions in which someone was killed or seriously injured (since 2021, within 500 m); City of Toronto School Safety Zones and Traffic Calming Database.
Other crimes near this address
| Last 12 months | Within 500 m | Harbourfront-CityPlace, per 100,000 residents | Compared with other neighbourhoods |
|---|---|---|---|
| Shootings and firearm discharges | 0 | 11 | Higher than most |
| Bicycle thefts | 39 | 196 | Higher than most |
| Thefts from vehicles | 35 | 231 | Higher than most |
Toronto Police Service: Shootings and Firearm Discharges, Bicycle Thefts and Theft From Motor Vehicle, June 2025 to June 2026. Police place each incident at the nearest intersection.
04Getting around from 255 Front St W
The nearest subway station is St Andrew Station (Line 1), about a 7‑minute walk (0.4 km). Within a 5‑minute walk there are 3 TTC stops served by the 504 and 503 streetcars, with about 1,602 departures on a typical weekday. The nearest GO train station is Union Station GO, 0.5 km away, with 354 train stops on a weekday.
Source: TTC · Line 1 · about 7 min walk
Source: GO Transit · 354 train stops on a weekday
TTC and GO Transit schedules for a typical weekday (Nov 11, 2026). Walking times are estimates. Bike Share Toronto station data; City of Toronto Cycling Network and Permit Parking Areas.
How reliable are your routes?
| Route | Delays reported | Per 1,000 trips | Compared with other TTC routes |
|---|---|---|---|
| 504 | 1,782 | 7.1 | more than most routes |
| 503 | 881 | 7.2 | more than most routes |
TTC Bus and Streetcar Delay Data, September 2025 to September 2026: incidents the TTC logged as delaying service. Per 1,000 trips uses each route’s weekday schedule, so busy routes aren’t penalized for running more vehicles. A typical route: 4.0.
Charging and bike parking
- EV charging: 40 York St
City-run (Green P): 12 Level 2 ports. Next: 10 Soho St, 865 m.320 m - Indoor bike station: Union Station
Secure parking for 160 bikes.390 m
City of Toronto: City-operated EV charging stations (private chargers aren’t included); indoor bike stations, shown within 1.5 km.
05Schools and child care near 255 Front St W
The closest public and Catholic schools. They may not be the ones assigned to this address; check with the Toronto District School Board (TDSB) or Toronto Catholic District School Board (TCDSB).
Elementary schools
Share of Grade 6 students meeting the provincial standard. Toronto: 87% reading, 54% math.
Secondary schools
Share of students who passed the Grade 10 literacy test on their first try. Toronto: 84%.
The red tick on each bar is the Toronto average. Source: Ontario Ministry of Education (2026), EQAO results.
Within 500 m (about a 6‑minute walk): five licensed child care centres and no EarlyON centres.
Last health inspection Jan 6, 2026: pass (fail to provide current written policies on infection prevention and control).
Last health inspection Jan 30, 2026: pass.
Last health inspection Jan 30, 2026: pass (fail to provide an ipac sink equipped with paper towels; fail to provide current written policies on management and reporting of communicable disease).
Source: City of Toronto Licensed Child Care Centres, EarlyON Child and Family Centres, and ChildCareSafe (Toronto Public Health inspections).
06Parks, trees and libraries near 255 Front St W
There are 6 parks and 1 playground within 500 m. The nearest pool is Harrison Pool, 850 m away.
Parks and community centres within 500 m
- Simcoe Park · 240 Front St W · 78 m
- Isabella Valancy Crawford Park · 299 Front St W · 180 m
- Olympic Park · 222 Bremner Blvd · 203 m
- David Pecaut Square · 215 King St W · 265 m
- Bobbie Rosenfeld Park · 294 Bremner Blvd · 277 m
Pools, courts and more
Also nearby
Source: City of Toronto Parks and Recreation Facilities, Registered Programs and Drop-In Programs, Tennis Courts, Outdoor and Indoor Ice Rinks, Washroom Facilities, Off-Leash Areas, Street Tree Data; Toronto Public Health SwimSafe and Beach Water Quality; Toronto Public Library branches.
Park space
Park projects nearby
- Rees Street Park
A new park is coming to 318 Queens Quay. Learn more about the project and how you can get involved.In progress · 594 m - New Park at 229 Richmond Street West
A new 2,600m2 park is coming to 229 Richmond St. W. The park site is currently leased to a restaurant and used as an outdoor patio.In progress · 618 m - New Park at 105 Spadina Avenue
A new 1,000 m2 park is coming to 105 Spadina Ave., at the southeast corner of Spadina Avenue and Adelaide Street.In progress · 737 m - Canoe Landing Park Off-Leash Area Improvements
The City is improving the off-leash area in Canoe Landing Park.In progress · 920 m - Toronto Island Park Projects
Following City Council’s adoption of the Toronto Island Park Plan in July 2024, the City is moving forward with projects to enhance and protect the park over time, guided by the plan’s long-term vision.In progress · 988 m
City of Toronto: Green Spaces (parks, natural areas and conservation land; hydro corridors, golf courses, cemeteries and road verges aren’t counted); Park and Recreation Facility Projects within 1.5 km.
07The building at 255 Front St W
There are no heritage listing or short-term rental registrations on record for 255 Front St W. Here is what the City does have.
Source: Building Construction/Demolition Violations
Source: Building Permits · 88 on record
- Garbage and waste, opened Sep 15, 2026: closed
- Property standards, opened Aug 10, 2025: still open
- Property standards, opened Aug 10, 2025: still open · order or notice issued Jun 29, 2026
- Graffiti, opened Jun 11, 2025: closed
- Graffiti, opened Mar 26, 2025: closed
Source: Municipal Licensing and Standards investigations · complaints and the City’s follow-up
Source: Preliminary Zoning Reviews
Permit history: 12 projects from 25 permits (most recent 25 of 88)
- Temporary Structures · permit issued · issued Mar 16, 2026
Temporary container structure for CMPX Trade show. Set up - Mar 22, 2026; Tear down - Apr 6, 2026 · Permit 26 126598 - Building work · permit issued · issued Nov 14, 2025
East loading dock ramp rehabilitation for the Metro Toronto Convention Centre complex. · Permit 25 228637 - Building work · completed Jun 27, 2025
Proposal to enlarge the existing patio - The Pint Public House · Permit 25 142142 - Building work · completed Apr 4, 2025
Proposal to enlarge existing exterior patio - The Pint Public House · Permit 25 133721 - Interior Alterations · completed May 14, 2025
Proposal for interior alterations - fit out for new coffee shop · 3 permits in this project (such as building, plumbing and heating) · Permit 25 121700 - Temporary Structures · completed Mar 2, 2026
Proposal to construct a temporary structure for a Trade Show Booth - Metro Toronto Convention Centre Installed on Feb. 27 2025 and being removed on Mar. 5 2025 · Permit 25 110290 - Fire Alarm · permit issued · issued Dec 20, 2024
Fire alarm system retrofit · Permit 24 242152 - Garage Repair/Reconstruction · completed Nov 7, 2025
Wholesale rehabilitation and protection of the East Loading Dock and a portion of the suspended parking levels 4A and 4B of the Metro Toronto Convention Centre. · Permit 24 202951 - Temporary Structures · completed Sep 9, 2025
Proposal to construct a temporary 2 storey structure for a Trade Show Booth - Metro Toronto Convention Centre Installed on November 27, 2023 and being removed on December 1, 2023 · Permit 23 224311 - Temporary Structures · completed Jul 22, 2025
Building a double deck temporary sales booth being constructed inside the Metro Toronto Convention Centre for an event June 27-June 29, 2023 · Permit 23 153037 - Garage Repair/Reconstruction · permit issued · issued Jun 9, 2023
Rehabilitation of a portion of the west podium deck waterproofing replacement, localized concrete repairs, and replacement of paving stone finishes. - Podium Deck - Convention Centre · Permit 23 144525 - Temporary Structures · completed Jun 30, 2022
Proposal for the installation of a temporary structure (double decker aluminum structure) for the Tradeshow - Rendezvous Canada, Destination Canada booth, Metro Toronto Convention Centre, North Hall… · Permit 22 120862
The lot
Measured from the City’s property boundary map. It’s compiled from records of varying age, so treat these as approximate; a survey is the legal measure.
Green roof and solar permits
No green roof or solar hot water permits at this address. Within 500 m: 15 with a green roof.
City of Toronto Building Permits: Green Roofs, and Solar Hot Water Heaters.
08What can be built at 255 Front St W
This lot isn’t covered by the citywide zoning by-law (569-2013). It is still under a former municipal by-law from before amalgamation, which the City’s map shows in grey.
Special areas
Source: City of Toronto Zoning By-law 569-2013 (zone, height and lot coverage overlays), Heritage Conservation Districts, Major Transit Station Areas, Secondary Plans and Archaeological Potential. This is a summary, not a zoning review. Read the by-law and see the City’s map.
09Around the block
Stays of less than 28 days, like Airbnb. That's more than at almost all Toronto addresses.
Houses that rent individual rooms with shared kitchens or bathrooms. The City licenses them to enforce safety standards.
Bao House Fort York (restaurant or bar), Infinity Mart (take-out or food shop).
155 and 181 Wellington Street West (162 m), 301 Front Street West (164 m), 300 Front Street West (178 m), and 11 more.
Homes in City-backed affordable housing projects that are approved or under way.
Affordable housing projects within 500 m (4)
| Address | Stage | Affordable homes | Distance |
|---|---|---|---|
| 315 Front St W | Rezoning approved | 32 | 210 m |
| 315 Front St W | Rezoning approved | 16 | 210 m |
| 212 King St W | Rezoning approved | 11 | 404 m |
| 100 Simcoe St | Application under review | 28 | 462 m |
Source: Affordable Housing Pipeline, Rental Housing Demolition and Conversion applications, Short Term Rentals Registration, Multi-Tenant (Rooming) House Licences, Business Licences and Permits (storefront types; owners’ personal names are never shown), POPS, and Daily Shelter Occupancy (Nov 9, 2026). Confidential shelter locations are not published.
Traffic on your street
There’s no recent count on this street. The nearest, on a similar street:
City of Toronto Transportation Services: speed, volume and classification counts since 2016.
Parking tickets on this block
622 tickets in 2025 on Front St W between numbers 205 and 305: 405 for parking on a boulevard or private property, 140 for stopping where it’s not allowed.
City of Toronto Parking Tickets, 2025. Placed by the street address the officer recorded.
Main street business area
Toronto Downtown West BIA, which includes this address. Business Improvement Areas are local business associations that run street events and improvements.
City of Toronto Business Improvement Areas, within 400 m.
What neighbours report to 311
In the last 12 months, 5,226 service requests came from postal area M5V, which includes 255 Front St W. The most common:
| Amplified music or instrument noise | 525 | |
| Injured wildlife | 292 | |
| Graffiti on private property | 209 | |
| Property standards | 209 | |
| Posters on City property | 208 | |
| Illegal dumping | 143 |
City of Toronto 311 Service Requests, October 2025 to October 2026. 311 publishes only the first three characters of the postal code, so this covers the wider postal area. Counts reflect how often people call as well as how often problems happen.
10Risks and environment at 255 Front St W
Source: TRCA Regulation mapping 2025
Source: Non Regulated Lead Sample · 32 tests, May 22, 2014 to Aug 26, 2025
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
11The neighbourhood: Harbourfront-CityPlace
Harbourfront-CityPlace had 28,135 residents in 2021. The median household income was $90,000, about the same as the typical Toronto neighbourhood ($85,000). 60% of households rent (typical neighbourhood: 46%). 44% of renters spend 30% or more of their income on housing. 24% of workers commuted by transit and 33% walked or cycled (typical neighbourhood: 26% and 5%). The most common first languages other than English and French are Mandarin (7.3%), Hindi (3.8%) and Spanish (3.8%). Source: 2021 Census; the next census was taken in 2026.
Rents aren't published for single neighbourhoods. Across central Toronto (the old City of Toronto, before the 1998 amalgamation), a two-bedroom in a purpose-built rental building averaged $2,457 a month in October 2025, up 6% from a year earlier. The Toronto average was $2,055. The vacancy rate was 3.2%. These averages include long-term tenants; new listings usually cost more.
| Average rent, October 2025 | Central Toronto | Change in a year | Toronto |
|---|---|---|---|
| Studio | $1,526 | +2% | $1,499 |
| 1 bedroom | $1,914 | +4% | $1,763 |
| 2 bedrooms | $2,457 | +6% | $2,055 |
| 3 bedrooms or more | $3,195 | 0% | $2,361 |
Source: CMHC, Rental Market Survey (October 2025), purpose-built rental apartments, central Toronto (the old City of Toronto, before the 1998 amalgamation). CMHC doesn’t publish rents for single neighbourhoods. Adapted by My Address in Toronto.
How Harbourfront-CityPlace compares with the rest of Toronto →Handy info
Councillor: Ausma Malik, Ward 10 Spadina-Fort York · Councillor_Malik@toronto.ca · 416-392-4044
Source: Solid Waste Collection Schedule; City of Toronto elected officials, as of Nov 11, 2026.
Archive photos from near this address: myaddressintoronto.com/address/255-front-st-w#sec-history








