53 Ontario St
53 Ontario St is in Moss Park. A 25‑storey building with 446 homes and shops is under review 194 m away.
Data as of Nov 12, 2026 · Every item lists its source
- 1 open building order from the City.
- A public hearing on Nov 4 about a proposal to split the lot at 90 Ontario St, 117 m away.
- A 25-storey building with 446 homes and shops is under review, 194 m away.
- Assaults, break-ins and robberies in Moss Park were above the Toronto rate in 2025.
- 7 collisions killed or seriously injured someone within 500 m since 2021; 2 involved pedestrians.
01What’s planned near 53 Ontario St
9 planning proposals within 250 m (about a 3‑minute walk): eight in progress and one inactive. A proposal that covers several addresses or City files is listed once. That's more than at 98% of Toronto addresses.
In progress
- 1Split the lot90 Ontario St · 117 m awayCommittee of Adjustment · Consent: permission to split a lot or change property lines
A public hearing is set for Nov 4, 2027 at TBA. Neighbours can send comments or speak at the hearing.
To obtain consent to sever the property into two lots (Building B and Building C) and to create new reciprocal stratified easements/rights-of-way.File B0056/26TEY · submitted Sep 23, 2026 · look it up on the City’s Application Information Centre - 2Site plan494 Richmond St E · 125 m awaySite plan: City review of the design and layout of a new building
City planners have been reviewing it since 2023. Residents can comment before a decision is made.
The Proposed Development will consist of approximately 35,250 square metres of total gross floor area, including about 400 square metres of commercial uses at-grade, for a total FSI of 10.1. Residential uses are located in the podium and…File 23 173470 STE 13 SA · submitted Jul 12, 2023 · City record and how to comment - 3Subdivision80 B Power St and 10 more addresses · 154 m awaySubdivision: a request to divide land into new lots and streets
City planners have been reviewing it since 2021. Residents can comment before a decision is made.
Draft Plan of subdivision for 3 blocks.File 21 235160 STE 13 SB · submitted Nov 7, 2021 · City record and how to commentAll 11 addresses
80 B Power St · 161 Parliament St · 167 Parliament St · 80 Power St · 90 Power St · 92 Power St · 94 Power St · 351 Queen St E · 363 Queen St E · 371 Queen St E · 373 Queen St E
- 4Minor variance550 Adelaide St E · 160 m awayCommittee of Adjustment · Minor variance: permission to bend a zoning rule, such as height, size or setbacks
A public hearing is set for Dec 9, 2026 at 9:30 a.m. Neighbours can send comments or speak at the hearing.
To alter the development standards as approved under Site Specific Zoning By-law 1306-2023, by increasing the maximum residential gross floor area from 19,800 m² to 24,000 m², the total gross floor area (for residential and…File A0674/26TEY · submitted Aug 28, 2026 · look it up on the City’s Application Information Centre - 543-storey building · 380 homes and shops69 Ontario St and 5 more addresses · 163 m away3 City files for one project: Rezoning · Site plan · Condominium380 homes23,139 m² of floor space
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Zoning By-law Amendment application to permit a 43-storey mixed-use building that includes 278 square metres of retail space on the ground floor and 380 dwelling units above.All 6 addresses
69 Ontario St · 71 Ontario St · 75 Ontario St · 429 Richmond St E · 431 Richmond St E · 455 Richmond St E
File 19 265929 STE 13 OZ (rezoning) · submitted Dec 31, 2019 · City record and how to commentFile 23 187639 STE 13 SA (site plan) · submitted Aug 11, 2023 · City record and how to commentFile 21 235323 STE 13 CD (condominium) · submitted Nov 8, 2021 · City record and how to comment - 646-storey building · 419 homes and shops126 Parliament St and 4 more addresses · 184 m awaySite plan: City review of the design and layout of a new building419 homes
It has been appealed to the Ontario Land Tribunal (formerly the OMB), which will make the final decision.
Site Plan Application for a 46 storey (156.3 metres including mechanical penthouse) mixed-use building with 419 dwelling units and 328 square metres of commercial uses at grade.File 23 188919 STE 13 SA · submitted Aug 14, 2023 · City record and how to commentAll 5 addresses
126 Parliament St · 128 Parliament St · 130 Parliament St · 134 Parliament St · 529 Richmond St E
- 735-storey building · 257 homes and shops102 Berkeley St · 185 m away2 City files for one project: Site plan · Condominium257 homes
City planners have been reviewing it since 2023. Residents can comment before a decision is made.
Proposed 35-storey (119.45 metres including the mechanical penthouse) mixed-use building containing 120 square metres of ground level retail uses and 257 dwelling units above and a 213 square metre park.File 23 186575 STE 13 SA (site plan) · submitted Aug 10, 2023 · City record and how to commentFile 21 235248 STE 13 CD (condominium) · submitted Nov 8, 2021 · City record and how to comment - 825-storey building · 446 homes and shops245 Queen St E and 1 more address · 194 m awaySite plan: City review of the design and layout of a new building446 homes60,739 m² of floor space
City planners have been reviewing it since 2021. Residents can comment before a decision is made.
Site Plan Approval for a 25-storey mixed-use building having a non-residential gross floor area of 24,936 square metres, and a residential gross floor area of 35,803 square metres. A total of 446 residential dwelling units, and 180…File 21 169132 STE 13 SA · submitted Jun 11, 2021 · City record and how to commentAll 2 addresses
Inactive
- 925-storey building · 206 homes301 Queen St E and 4 more addresses · 36 m awaySite plan: City review of the design and layout of a new building206 homes
Inactive: no recent activity on this file. The City hasn’t closed it, but it isn’t moving.
Site Plan application for a 25-storey mixed-use building: 206 dwelling units, 6 levels of below-grade parking, total combined GFA 15,711 m².File 16 161258 STE 28 SA · submitted May 25, 2016 · look it up on the City’s Application Information CentreAll 5 addresses
301 Queen St E · 305 Queen St E · 311 Queen St E · 315 Queen St E · 317 Queen St E
Development Applications and Committee of Adjustment Applications, City of Toronto. A proposal that covers several addresses or City files is listed once. Inactive: the City’s file is still open but marked inactive. Decided: development files submitted in the last 4 years; Committee of Adjustment decisions in the last 2 years.
Noise permits nearby
- 49 Ontario · 49 Ontario St
Continuous concrete pour · DCC 49 Ontario EastMay 12 to Nov 12 · 7 am to 10 pm
35 m away - Private event · 49 Ontario St
Construction · DCC 49 Ontario EastSept 30, 2026 to Sept 5, 2027 · 7 am to 10 pm
35 m away
City of Toronto Noise Exemption Permits: permits that let a site go past the noise bylaw’s limits for a set time (amplified sound for an event, construction outside normal hours, a concrete pour). Upcoming and current permits within 600 m. Events run by individuals show their name only for street parties, festivals and markets.
02Street work near 53 Ontario St
2 City road or sidewalk projects are planned within 500 m. The closest: road resurfacing on George St, King St E to Adelaide St E, Q2 2025 to Q2 2026.
Utility digs within 250 m
- Toronto Water · Water and Sewer Connection at 106 Ontario St · 127 m · Jun 2, 2026 to Dec 2, 2026
- Toronto Water · Water and Sewer Connection at 49 Ontario St · 35 m · Jul 20, 2026 to Dec 30, 2026
Source: City of Toronto Road Reconstruction, Road Resurfacing and Sidewalk Construction programs (planned work within 500 m), and Utility Cut Permits. Dates are the City’s plan and can move. “Carried over” means the work was due earlier and is still listed.
03Safety near 53 Ontario St
Police recorded 353 major crimes within 500 m of this address from Oct 2025 to Sep 2026. That's more than at almost all Toronto addresses. The table compares the neighbourhood's rates with Toronto's.
Moss Park compared with Toronto · rate per 100,000 residents, 2025
| Major crime | Near this addresswithin 500 m, last 12 months | Compared with the Toronto rate | Difference |
|---|---|---|---|
| Assaults | 249 near this address | 190% higher2,227 vs 768 per 100,000 | |
| Robberies | 24 near this address | 112% higher167 vs 79 per 100,000 | |
| Break-ins | 57 near this address | 85% higher350 vs 190 per 100,000 | |
| Thefts over $5,000 | 12 near this address | About the same65 vs 61 per 100,000 | |
| Car thefts | 11 near this address | 64% lower82 vs 225 per 100,000 |
Source: Toronto Police Service Public Safety Data Portal, Major Crime Indicators (Oct 5, 2025 to Sep 30, 2026) and Neighbourhood Crime Rates. Reported incidents only; police place each incident at the nearest intersection. Five-year trends for Moss Park
Traffic safety
7 collisions killed or seriously injured someone within 500 m since 2021; 2 involved pedestrians, 2 involved cyclists and 1 was fatal. Most were on Queen St E and Parliament St. Moss Park has more of these collisions per resident than most neighbourhoods.
- Queen St E at Berkeley St · Cyclist, seriously injured · Jul 6, 2026 · 218 m
- Ontario St at Queen St E · Pedestrian, seriously injured · Oct 31, 2025 · 193 m
- Shuter St at Trefann St · Cyclist, seriously injured · Jul 27, 2024 · 462 m
- Queen St E at Sackville St · Pedestrian, killed · Jul 18, 2024 · 491 m
Source: Toronto Police Service, collisions in which someone was killed or seriously injured (since 2021, within 500 m); City of Toronto School Safety Zones and Traffic Calming Database.
Other crimes near this address
| Last 12 months | Within 500 m | Moss Park, per 100,000 residents | Compared with other neighbourhoods |
|---|---|---|---|
| Shootings and firearm discharges | 1 | 14 | Higher than most |
| Bicycle thefts | 38 | 209 | Higher than most |
| Thefts from vehicles | 48 | 400 | Higher than most |
Toronto Police Service: Shootings and Firearm Discharges, Bicycle Thefts and Theft From Motor Vehicle, June 2025 to June 2026. Police place each incident at the nearest intersection.
04Getting around from 53 Ontario St
The nearest subway station is King Station (Line 1), about a 17‑minute walk (1.1 km). Within a 5‑minute walk there are 20 TTC stops served by the 504, 501 and 503 streetcars and the 75 and 65 buses, with about 7,206 departures on a typical weekday. The nearest GO train station is Union Station GO, 1.5 km away, with 354 train stops on a weekday.
Source: TTC · Line 1 · about 17 min walk
Source: GO Transit · 354 train stops on a weekday
TTC and GO Transit schedules for a typical weekday (Nov 18, 2026). Walking times are estimates. Bike Share Toronto station data; City of Toronto Cycling Network and Permit Parking Areas.
How reliable are your routes?
| Route | Delays reported | Per 1,000 trips | Compared with other TTC routes |
|---|---|---|---|
| 504 | 1,782 | 7.1 | more than most routes |
| 501 | 2,049 | 10.7 | more than most routes |
| 75 | 449 | 4.7 | more than most routes |
| 65 | 303 | 3.6 | about typical |
| 503 | 881 | 7.2 | more than most routes |
| 121 | 159 | 3.6 | about typical |
TTC Bus and Streetcar Delay Data, September 2025 to September 2026: incidents the TTC logged as delaying service. Per 1,000 trips uses each route’s weekday schedule, so busy routes aren’t penalized for running more vehicles. A typical route: 4.0.
Charging and bike parking
- EV charging: 2 Church St
City-run (Green P): 24 Level 2, 4 fast ports. Next: 51 Dockside Dr, 1.1 km.950 m - Indoor bike station: City Hall
Secure parking for 300 bikes.1.4 km
City of Toronto: City-operated EV charging stations (private chargers aren’t included); indoor bike stations, shown within 1.5 km.
05Schools and child care near 53 Ontario St
The closest public and Catholic schools. They may not be the ones assigned to this address; check with the Toronto District School Board (TDSB) or Toronto Catholic District School Board (TCDSB).
Elementary schools
Share of Grade 6 students meeting the provincial standard. Toronto: 87% reading, 54% math.
Secondary schools
Share of students who passed the Grade 10 literacy test on their first try. Toronto: 84%.
The red tick on each bar is the Toronto average. Private schools within 1 km: Liberty Prep School, Voice Integrative Private School, Keystone International Schools. Source: Ontario Ministry of Education (2026), EQAO results.
Within 500 m (about a 6‑minute walk): four licensed child care centres and three EarlyON centres.
Last health inspection Mar 26, 2026: pass.
Last health inspection Feb 26, 2026: pass.
Last health inspection Feb 20, 2026: pass.
Source: City of Toronto Licensed Child Care Centres, EarlyON Child and Family Centres, and ChildCareSafe (Toronto Public Health inspections).
06Parks, trees and libraries near 53 Ontario St
There are 7 parks, 4 playgrounds and 3 community centres within 500 m. The nearest pool is John Innes Community Recreation Centre, 400 m away.
Parks and community centres within 500 m
- 40 Power St Park · 48 Power St · 276 m
- Little Trinity Church Lands · playground · 417 King St E · 333 m
- Moss Park Arena · 140 Sherbourne St · 374 m
- Orphan's Green · dog off-leash area · 51 Power St · 381 m
- John Innes Community Recreation Centre · wi-fi · 150 Sherbourne St · 400 m
Pools, courts and more
Also nearby
Source: City of Toronto Parks and Recreation Facilities, Registered Programs and Drop-In Programs, Tennis Courts, Outdoor and Indoor Ice Rinks, Washroom Facilities, Off-Leash Areas, Street Tree Data; Toronto Public Health SwimSafe and Beach Water Quality; Toronto Public Library branches.
Park space
Park projects nearby
- New Parks in the Moss Park Neighbourhood
Two new parks are coming to the Moss Park neighbourhood. Learn more about the project and how you can get involved.In progress · 147 m - New Parks in the Moss Park Neighbourhood
Two new parks are coming to the Moss Park neighbourhood. Learn more about the project and how you can get involved.In progress · 178 m - Moss Park Arena Improvements
The City is making upgrades to the building's interior, including the washroom, boardroom, snack bar, pro shop, Zamboni room and multipurpose rooms. Construction is expected to take place from summer 2027 to summer 2028.In progress · 375 m - Moss Park Park Improvements & John Innes Community Recreation Centre Replacement
The City is improving Moss Park and John Innes Community Recreation Centre to better serve all community members.In progress · 402 m - Market Lane Park Improvements
The City is improving Market Lane Park. Learn more about the project and how you can get involved.In progress · 630 m
City of Toronto: Green Spaces (parks, natural areas and conservation land; hydro corridors, golf courses, cemeteries and road verges aren’t counted); Park and Recreation Facility Projects within 1.5 km.
07The building at 53 Ontario St
There are no by-law investigations, heritage listing or short-term rental registrations on record for 53 Ontario St. Here is what the City does have.
Source: Building Construction/Demolition Violations
Source: Building Permits · 17 on record
Permit history: 6 projects from 17 permits
- Interior renovation · completed Oct 30, 2023
Interior alterations to retail unit 2, exterior alterations to unit · 4 permits in this project (such as building, plumbing and heating) · Permit 22 123118 - Electromagnetic Locks · completed Jan 11, 2021
Install maglocks in main floor doors and 9th floor patio · Permit 20 211076 - Alternative Solution · completed Aug 13, 2019
Alternative solution for a standpipe system · Permit 19 144153 - Alternative Solution · completed Dec 2, 2021
Alternative solution for a 3 sided pool deck · Permit 19 144156 - Demolition · completed Aug 20, 2025
Proposal demolish 1 storey portion of building. Present use is a presentation centre. Convenience address is 102 Berkeley St. · Permit 17 237243 - New Building · completed Apr 15, 2026
REVISION - add a mezzanine to Unit 101 on the ground floor and alterations to level 8 as per the CofA decision 21 117212 STE 13 MV and Final and Binding A0187/21TEY. Also provide private hot tub on… · 9 permits in this project (such as building, plumbing and heating) · Permit 17 237216
The lot
Measured from the City’s property boundary map. It’s compiled from records of varying age, so treat these as approximate; a survey is the legal measure.
Green roof and solar permits
Building permits at this address included a green roof (2021). Within 500 m: 15 with a green roof.
City of Toronto Building Permits: Green Roofs, and Solar Hot Water Heaters.
08What can be built at 53 Ontario St
CR (Commercial Residential) zoning allows shops and offices on the ground floor with homes above, typical of main streets. The numbers below are the main limits; the full rules depend on the lot.
Source: Zoning By-law 569-2013, chapter 40
Source: Height overlay
Source: Zone label (x)
Special areas
Source: City of Toronto Zoning By-law 569-2013 (zone, height and lot coverage overlays), Heritage Conservation Districts, Major Transit Station Areas, Secondary Plans and Archaeological Potential. This is a summary, not a zoning review. Read the by-law and see the City’s map.
09Around the block
Stays of less than 28 days, like Airbnb. That's more than at 91% of Toronto addresses.
Houses that rent individual rooms with shared kitchens or bathrooms. The City licenses them to enforce safety standards.
Shoppers Drug Mart (take-out or food shop), Masala Guys (take-out or food shop), Infinity Vape (vape shop), and 1 more.
424-460 Adelaide Street East (82 m), 406 Adelaide Street East (110 m), 93-95 Berkeley Street and 112-124 Parliament Street (156 m), and 2 more.
Homes in City-backed affordable housing projects that are approved or under way.
The City requires most demolished rental homes to be replaced at similar rents.
Sojourn House Ontario St (127 m), Maxwell Meighen Centre (309 m), Good Shepherd Centre (432 m), and 1 more.
All new business licences in Moss Park (4)
- Shoppers Drug Mart · Take-out or food shop · 275 Queen St E · 185 m · licensed Oct 23, 2026
- Masala Guys · Take-out or food shop · 234 Parliament St · 446 m · licensed Oct 11, 2026
- Infinity Vape · Vape shop · 200 Dundas St E · 763 m · licensed Sep 10, 2026
- Icha Tea · Restaurant or bar · 8 Eastern Ave · 459 m · licensed Aug 14, 2026
Affordable housing projects within 500 m (5)
| Address | Stage | Affordable homes | Distance |
|---|---|---|---|
| 49 Ontario St | Under construction | 245 | 35 m |
| 254 King St E | Rezoning approved | 190 | 149 m |
| 348 Richmond St E | Rezoning approved | 30 | 188 m |
| 261 Queen St E | Under construction | 13 | 205 m |
| 125 George St | Under construction | 7 | 414 m |
Rental demolitions approved within 500 m (1)
- 329-337 Queen Street East, 135R-141R and 139-141 Berkeley Street · 7 rental homes to be demolished, 7 replaced · 221 m · approved Jul 29, 2026 · City report
Source: Affordable Housing Pipeline, Rental Housing Demolition and Conversion applications, Short Term Rentals Registration, Multi-Tenant (Rooming) House Licences, Business Licences and Permits (storefront types; owners’ personal names are never shown), POPS, and Daily Shelter Occupancy (Nov 10, 2026). Confidential shelter locations are not published.
Traffic on your street
There’s no recent count on this street. The nearest, on a similar street:
City of Toronto Transportation Services: speed, volume and classification counts since 2016.
Parking tickets on this block
523 tickets in 2025 on Ontario St between numbers 3 and 103: 200 for stopping where it’s not allowed, 117 for unpaid parking.
City of Toronto Parking Tickets, 2025. Placed by the street address the officer recorded.
Main street business area
Old Town Toronto BIA, which includes this address. Business Improvement Areas are local business associations that run street events and improvements.
City of Toronto Business Improvement Areas, within 400 m.
What neighbours report to 311
In the last 12 months, 7,360 service requests came from postal area M5A, which includes 53 Ontario St. The most common:
| Property standards | 516 | |
| Illegal dumping | 307 | |
| Injured wildlife | 289 | |
| Amplified music or instrument noise | 243 | |
| Posters on City property | 196 | |
| Graffiti on private property | 163 |
City of Toronto 311 Service Requests, October 2025 to October 2026. 311 publishes only the first three characters of the postal code, so this covers the wider postal area. Counts reflect how often people call as well as how often problems happen.
10Risks and environment at 53 Ontario St
Source: TRCA Regulation mapping 2025
Source: Non Regulated Lead Sample · 134 tests, May 21, 2014 to Oct 15, 2026
TRCA mapping is for screening, not site-specific decisions. Lead results are voluntary samples from homes in the postal area, not this address.
11The neighbourhood: Moss Park
Moss Park had 21,490 residents in 2021. The median household income was $65,000, lower than the typical Toronto neighbourhood ($85,000). 65% of households rent (typical neighbourhood: 46%). 40% of renters spend 30% or more of their income on housing. 27% of workers commuted by transit and 37% walked or cycled (typical neighbourhood: 26% and 5%). The most common first languages other than English and French are Mandarin (3.4%), Cantonese (3.1%) and Spanish (2.9%). Source: 2021 Census; the next census was taken in 2026.
Rents aren't published for single neighbourhoods. Across central Toronto (the old City of Toronto, before the 1998 amalgamation), a two-bedroom in a purpose-built rental building averaged $2,457 a month in October 2025, up 6% from a year earlier. The Toronto average was $2,055. The vacancy rate was 3.2%. These averages include long-term tenants; new listings usually cost more.
| Average rent, October 2025 | Central Toronto | Change in a year | Toronto |
|---|---|---|---|
| Studio | $1,526 | +2% | $1,499 |
| 1 bedroom | $1,914 | +4% | $1,763 |
| 2 bedrooms | $2,457 | +6% | $2,055 |
| 3 bedrooms or more | $3,195 | 0% | $2,361 |
Source: CMHC, Rental Market Survey (October 2025), purpose-built rental apartments, central Toronto (the old City of Toronto, before the 1998 amalgamation). CMHC doesn’t publish rents for single neighbourhoods. Adapted by My Address in Toronto.
How Moss Park compares with the rest of Toronto →Handy info
Garbage day: Wednesdays. Nov 18: garbage, green bin and yard waste. Nov 25: recycling and green bin. Green bin every week; garbage and recycling alternate.
Councillor: Chris Moise, Ward 13 Toronto Centre · Councillor_Moise@toronto.ca · 416-392-7903
Source: Solid Waste Collection Schedule; City of Toronto elected officials, as of Nov 12, 2026.
Archive photos from near this address: myaddressintoronto.com/address/53-ontario-st#sec-history








